Free Order on Motion for Summary Judgment - District Court of Connecticut - Connecticut


File Size: 210.6 kB
Pages: 20
Date: July 20, 2007
File Format: PDF
State: Connecticut
Category: District Court of Connecticut
Author: unknown
Word Count: 5,028 Words, 31,499 Characters
Page Size: Letter (8 1/2" x 11")
URL

https://www.findforms.com/pdf_files/ctd/15562/73.pdf

Download Order on Motion for Summary Judgment - District Court of Connecticut ( 210.6 kB)


Preview Order on Motion for Summary Judgment - District Court of Connecticut
Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 1 of 20

UNITED STATES DISTRICT COURT DISTRICT OF CONNECTICUT --------------------------------x CONNECTICUT LIGHT & POWER : COMPANY, : : Plaintiff, : : V. : : NRG POWER MARKETING INC., : : Defendant. : --------------------------------x

CASE NO. 3:01CV02373(AWT)

RULING ON MOTION FOR SUMMARY JUDGMENT Plaintiff Connecticut Light & Power Company ("CL&P") brings this action in a two-count complaint against NRG Power Marketing Inc. ("NRG") asserting a claim for breach of contract and a claim for a declaratory judgment. NRG asserts four counterclaims:

Count I, breach of contract for failure by CL&P to refund amounts paid by NRG for congestion charges; Count II, breach of contract for CL&P's failure to pay amounts due and unilaterally deducting those amounts from the amounts due under monthly invoices; Count III, breach of the implied covenant of good faith and fair dealing; and Count IV, unjust enrichment. The plaintiff has

moved for summary judgment on all counts of the complaint and NRG's counterclaims, and its motion is being granted. I. Factual Background The New England Power Pool ("NEPOOL") "was created as a voluntary association of electric utilities in New England which established a single regional network to direct the operations of

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 2 of 20

the major generating and transmission facilities in the region." (Frederick W. Morris Aff. (Doc. No. 39), at Ex. A). The

Independent System Operator for New England ("ISONE") "was created to ensure competition in the generation and sale of electricity within NEPOOL." Id. ISONE administers the NEPOOL

Open Access Transmission Tariff ("NEPOOL OATT"), which contains regulations and rates, including a provision for congestion charges, and is approved by the Federal Energy Regulatory Commission ("FERC"). At all times pertinent to the complaint,

congestion charges were socialized under the NEPOOL OATT, meaning that "[r]egardless of where the transmission congestion was occurring, those costs were assigned to transmission providers and customers on a pro rata basis depending on their share of total network load." (Michael Pavo Aff. (Doc. No. 38), at ¶ 6).

Section 24 of the NEPOOL OATT provides: If limitations in available transmission capacity over any interface within the NEPOOL Control Area in any hour require that the System Operator dispatch resources outof-merit, the System Operator shall determine for the affected area or areas the aggregate of the Congestion Costs for all such out-of-merit resources for the hour. The Congestion Costs for each hour in any month shall be paid as a transmission charge . . . . *** [T]he "Congestion Cost" of an out-of-merit resource for an hour means the product of (i) the difference between its Dispatch Price and the Energy Clearing Price for the hour, times (ii) the number of megawatt hours of out-ofmerit generation produced by the resource for the hour. (Robert A. Baumann Aff. (Doc. No. 40), at Ex. 1). 2

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 3 of 20

CL&P sought to enter into supply contracts to enable it to meet 50% of the total Standard Offer Service ("SOS") Requirements of CL&P's customers during the period from January 1, 2000 to December 31, 2003.1 The Department of Public Utility Control

("DPUC"), in a decision dated July 9, 1999, approved CL&P's "proposal to conduct a competitive solicitation process to procure 50% of the electricity supply required to serve the standard offer." (Shields Aff., at Ex. 4).

J.P. Morgan & Co. ("J.P. Morgan") conducted the bidding process as DPUC's exclusive agent on behalf of CL&P. J.P. Morgan

issued a Descriptive Memorandum and Request for Proposals which provided: Winner(s) will be responsible for all requirements and costs associated with meeting the contracted-for portion of CL&P's Standard Offer Service Requirements and Back-Up Services, including energy, Installed Capability, Operable Capability, Operating Reserves, Automatic Generation Control, VAR support, tie benefit payments, losses, any congestion charges, any other future requirements of NEPOOL and the Independent System Operator ("ISO") and any other future or current ISO administration charges as may apply to a load servicing entity[.] (Shields Aff., at Ex. 5, Section IV.1). J.P. Morgan also held a

Section 20 of Public Act 98-28, "`An Act Concerning Electric Restructuring' describes Standard Offer service as the electric generation services provided by an electric distribution company to any customer who (a) affirmatively chooses to receive electric generation services from such electric distribution company or (b) does not or is not able to arrange for or maintain electric generation services with an electric supplier." (Shields Aff., at Ex. 5). 3

1

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 4 of 20

conference with potential bidders on August 12, 1999. for proposals dated July 16, 1999 stated:

A request

The selected Standard Offer Service Requirements contractor(s), will be responsible for all requirements and costs associated with meeting the contracted-for portion of CL&P's Standard Offer Service Requirements and Back-up Services, including energy, Installed Capability, Operable Capability, Operating Reserves, Automatic Generation Control, VAR support, tie benefit payments, losses, any congestion charges and any other future requirements of NEPOOL and the Independent System Operator ("ISO"). (Morris Aff., at Ex. G). Craig Ganter, NRG's Rule 30(b)(6)

witness, testified that, after the presentation, J.P. Morgan provided additional information concerning the congestion charges. "The clarification came from J.P. Morgan and in some

subsequent e-mails or faxes or however they transmitted the answers to the questions that were raised at this technical conference, or they could have been raised subsequent to it because I believe they gave you an opportunity to ask them questions." (Ganter Dep. (Morris Aff., at Ex. L), at 34). When

asked, "[a]nd by `clarification' you mean that NRG would not be responsible for congestion charges?", Ganter responded, "[r]ight." Id. at 33-34. The clarification Ganter was referring

to is a communication from J.P. Morgan dated August 25, 1999, where the following question and answer appeared: Question: Section IV of the RFP transmission is addressed, what does it mean in the Descriptive Memorandum that CL&P will assist the bidders? What will CL&P actually do and be responsible for in making transmission arrangements? 4

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 5 of 20

What charges will CL&P as a transmission provider actually be responsible for and what charges will the winning bidder be responsible for? Connecticut requires as part of the electric industry restructuring that a customer receives a bill that clearly identifies costs associated with Transmission and Distribution charges and charges that are associated with the price of energy at the meter[,] it is unclear from the RFP which entity will be responsible with the various charges associated Transmission, Distribution, etc. Please provide a complete list of all transmission components that CL&P will be responsible to pay and those that a bidder will have responsibility for. Response: The bidder is not responsible for obtaining transmission service over the CL&P transmission system. CL&P will be responsible for Regional Network Service (RNS) and associated Schedule 1 and 2 charges through the NEPOOL Tariff and Local Network Service (LNS) and associated Schedule 1 charges through the NU System Companies' Open Access Transmission Service Tariff No. 9. In addition CL&P will be responsible for all ISO related charges assigned to transmission providers only. The bidder will be responsible for transmission charges to get power to the PTF outside of the NU PTF and those charges appropriately assigned to it by NEPOOL and/or the ISO. (Morris Aff., at Ex. M). Part 1 of Section IV of the Descriptive Part 2 of that section states:

Memorandum is quoted above.

CL&P will assist Winner(s) to make arrangements for Regional Network Service Under NEPOOL's open access tariff, Local Network Service under CL&P's open access tariff, and Distribution Service under the jurisdictional retail delivery tariff of the DPUC. The supplier will be responsible for losses to the customers' meters[.] (Shields Aff., at Ex. 5, Section IV.2). NRG was a successful bidder, and CL&P and NRG entered into a Standard Offer Service Wholesale Sales Agreement (the "Agreement") dated as of October 29, 1999, pursuant to which NRG, as the "Seller," was obligated to supply a portion of the 5

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 6 of 20

wholesale power needs of CL&P, as the "Buyer." Section 1.10 of the Agreement provides that: "SOS Requirements Power" means the firm wholesale power that Seller is obligated to deliver as defined in Section 3.1. (Shields Aff., at Ex. 3). Section 3.1 of the Agreement defines

SOS Requirements Power as follows: SOS Requirements Power is the wholesale power delivered at the Delivery Points(s) that is supplied at all times and in quantities reflecting the full requirements for power of Retail Customers purchasing Standard Offer Service from CL&P. SOS Requirements Power shall be firm and shall vary in quantity from minute to minute, hour to hour, day to day and month to month based on the consumption patterns of Retail Customers. SOS Requirements Power includes power supply and ancillary services, in such amounts as are required for the Buyer to serve the Contract Load Quantity plus losses at all times throughout the Term. SOS Requirements Power includes all of the power supply and ancillary services that are or may be necessary to serve electrical load under the Restated NEPOOL Agreement during the Term, including Energy, Installed Capability, Operable Capability, Operating Reserves, Automatic Generation Control, electrical losses, congestion charges imposed under the NEPOOL Transmission Tariff, charges of the ISO associated with NEPOOL membership and with serving the Contract Load Quantity, and any future additions, deletions or changes to the seven NEPOOL products (Energy, Installed Capability, Operable Capability, 30minute Non-Spinning Operating Reserves, and Automatic Generation Control) that are required for entities serving electrical load in NEPOOL. SOS Requirements Power shall also include such transmission and distribution delivery services as may be required for the Seller to deliver SOS Requirements Power to the Delivery Point(s). SOS Requirements Power shall not include any current or future requirement to meet a renewable energy portfolio standard in the State of Connecticut. (Shields Aff., at Ex. 3) (emphasis added). Also, the Agreement provides, at Section 3.10, that: 6

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 7 of 20

The Seller shall be responsible for and shall pay all ISO and NEPOOL charges and expenses associated with the provision of SOS Requirements Power, except for any such ISO or NEPOOL charges that are imposed directly on the Buyer in connection with the provision of Delivery Services by the Buyer. (Shields Aff., at Ex. 3). However, "Delivery Services" is

defined in Section 1.4 of the Agreement as not including congestion charges: "Delivery Services" means the combination of Regional Network Service ("RNS") over NEPOOL PTF acquired pursuant to the NEPOOL Transmission Tariff, Local Network Service ("LNS") over the Buyer's Non-Pool Transmission Facilities pursuant to the NU Operating Companies open access transmission tariff, and firm distribution services under the Buyer's distribution service tariff that are provided by the Buyer for the delivery of SOS Requirements Power for the Contract Load Quantity. Delivery Services shall not include losses, congestion charges, ancillary services or any ISO charges associated with SOS Requirements Power, all of which shall be the responsibility of the Seller. (Shields Aff., at Ex. 3) (emphasis added). The Agreement also contains a provision, in Section 3.12, which addresses how the parties will handle any rebates of congestion charges: If and to the extent that, at any time during the Term, the congestion management scheme in effect under the NEPOOL Transmission Tariff provides for the automatic assignment of rights to rebates of transmission congestion charges to retail loads of the Buyer, the Seller shall be entitled to a portion of such congestion rebate rights based on the ratio between the Contract Load Quantity and the Buyer's retail load that is subject to the automatic assignment of such rights. (Shields Aff., at Ex. 3). Finally, the Agreement contains a merger clause in Section 7

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 8 of 20

19.1, which states that "[t]his Agreement constitutes the entire agreement between the Parties and supersedes all previous offers, negotiations, discussions, communications and correspondence." Id. In correspondence dated April 20, 2000, CL&P informed NRG that NRG was responsible, pursuant to the Agreement, for congestion charges and CL&P had determined NRG's share of the charges for January and February 2000. These charges amounted to NRG made a

$6,416,433 for January and $5,905,667 for February. payment of $1,181,774.28.2

By letter dated July 18, 2000, NRG's The

attorney contacted CL&P regarding the congestion charges. letter stated:

"Unfortunately, NRG has already paid at least

$1,181,724.28 of these charges without an understanding of whether the amounts were appropriately due under the Standard Offer Contract." (Shields Aff., at Ex. 10). The letter stated

that NRG would not pay make any further payments and that, pursuant to the terms of the Agreement, "NRG is only responsible for, at most, a portion of the congestion charges." Id.

Northeast Utilities ("NU") responded, on behalf of CL&P, with a letter dated August 17, 2000. CL&P then withheld payments based on SOS related congestion

A letter from NRG's attorney stated $1,181,724.28 was paid (see Shields Aff., Electronic Funds Transfer dated 6/20/2000 a transfer to CL&P of $1,181,774.28. Id. 8

2

that at least at Ex. 10), but the indicates that NRG made at Ex. 8.

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 9 of 20

charges and interest for periods from March 2002 through December 2002, pursuant to Section 5.4 of the Agreement. Section 5.4

provides that "[t]he disputed amount [of a bill] may, at the discretion of the Buyer, be held by the Buyer until the dispute has been resolved; provided that the Buyer shall be responsible to pay interest on any withheld amounts that are determined to have been properly billed . . . ." (Shields Aff., at Ex. 3).

Northeast Utilities Service Company ("NUSCO") moved to intervene in Docket No. ER00-1659-000 before the Federal Energy Regulatory Commission on behalf of NU Operating Companies, which included CL&P. In a motion to intervene and protest dated March

14, 2000, NUSCO and others argued: The current method of allocating congestion costs within NEPOOL spreads the costs to each transmission customer on a pro rata basis. The costs are distributed over the entire NEPOOL load, thereby socializing the costs and masking the responsibility for them. This method distorts the competitive market pricing signals for electricity that the States served by Central Maine, UI, and the NU Operating Companies are trying to promote through restructuring initiatives which give retail customers a choice of suppliers. (Morris Aff., at Ex. F). by those who cause them. "These congestion costs should be borne Instead, some participants receive an Id.

undeserved windfall, while blameless others pay a subsidy."

Effective March 1, 2003, the Standard Market Design (SMD) replaced the system for socialized congestion charges and "each distinct location (node) has a calculated price for energy, losses and congestion." (Pavo Aff., at ¶ 6). 9 Under the SMD,

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 10 of 20

congestion charges "were quantified at various pricing nodes, i.e., measurement points, on New England's Pool Transmission Facilities (PFT)." II. Legal Standard A motion for summary judgment may not be granted unless the court determines that there is no genuine issue of material fact to be tried and that the facts as to which there is no such issue warrant judgment for the moving party as a matter of law. R. Civ. P. 56(c). Fed. (Baumann Supp. Aff. (Doc. No. 64), at ¶ 6).

See Celotex Corp. v. Catrett, 477 U.S. 317,

322-23 (1986); Gallo v. Prudential Residential Servs., 22 F.3d 1219, 1223 (2d Cir. 1994). Rule 56(c) "mandates the entry of

summary judgment . . . against a party who fails to make a showing sufficient to establish the existence of an element essential to that party's case, and on which that party will bear the burden of proof at trial." 322. When ruling on a motion for summary judgment, the court must respect the province of the jury. try issues of fact. The court, therefore, may not See Celotex Corp., 477 U.S. at

See, e.g., Anderson v. Liberty Lobby, Inc.,

477 U.S. 242, 255 (1986); Donahue v. Windsor Locks Board of Fire Comm'rs, 834 F.2d 54, 58 (2d Cir. 1987); Heyman v. Commerce & Indus. Ins. Co., 524 F.2d 1317, 1319-20 (2d Cir. 1975). It is

well-established that "[c]redibility determinations, the weighing of the evidence, and the drawing of legitimate inferences from

10

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 11 of 20

the facts are jury functions, not those of the judge." 477 U.S. at 255.

Anderson,

Thus, the trial court's task is "carefully

limited to discerning whether there are any genuine issues of material fact to be tried, not to deciding them. Its duty, in

short, is confined . . . to issue-finding; it does not extend to issue-resolution." Gallo, 22 F.3d at 1224.

Summary judgment is inappropriate only if the issue to be resolved is both genuine and related to a material fact. Therefore, the mere existence of some alleged factual dispute between the parties will not defeat an otherwise properly supported motion for summary judgment. An issue is "genuine

. . . if the evidence is such that a reasonable jury could return a verdict for the nonmoving party." (internal quotation marks omitted). Anderson, 477 U.S. at 248 A material fact is one that

would "affect the outcome of the suit under the governing law." Anderson, 477 U.S. at 248. As the Court observed in Anderson:

"[T]he materiality determination rests on the substantive law, [and] it is the substantive law's identification of which facts are critical and which facts are irrelevant that governs." at 248. Id.

Thus, only those facts that must be decided in order to

resolve a claim or defense will prevent summary judgment from being granted. When confronted with an asserted factual dispute,

the court must examine the elements of the claims and defenses at issue on the motion to determine whether a resolution of that

11

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 12 of 20

dispute could affect the disposition of any of those claims or defenses. judgment. Cir. 1990). When reviewing the evidence on a motion for summary judgment, the court must "assess the record in the light most favorable to the non-movant and . . . draw all reasonable inferences in its favor." Weinstock v. Columbia Univ., 224 F.3d Immaterial or minor facts will not prevent summary See Howard v. Gleason Corp., 901 F.2d 1154, 1159 (2d

33, 41 (2d Cir. 2000)(quoting Del. & Hudson Ry. Co. v. Consol. Rail Corp., 902 F.2d 174, 177 (2d Cir. 1990)). Because

credibility is not an issue on summary judgment, the nonmovant's evidence must be accepted as true for purposes of the motion. Nonetheless, the inferences drawn in favor of the nonmovant must be supported by the evidence. "[M]ere speculation and

conjecture" is insufficient to defeat a motion for summary judgment. Stern v. Trs. of Columbia Univ., 131 F.3d 305, 315 (2d

Cir. 1997) (quoting W. World Ins. Co. v. Stack Oil, Inc., 922 F.2d 118, 121 (2d. Cir. 1990)). Moreover, the "mere existence of

a scintilla of evidence in support of the [nonmovant's] position" will be insufficient; there must be evidence on which a jury could "reasonably find" for the nonmovant. 252. III. Discussion "If the language of the contract is susceptible to more than Anderson, 477 U.S. at

12

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 13 of 20

one reasonable interpretation, the contract is ambiguous . . . . By contrast, language is unambiguous when it has a definite and precise meaning . . . concerning which there is no reasonable basis for a difference of opinion.'" Ins. Co., 269 Conn. 550, 559 (2004). Goldberg v. Hartford Fire Furthermore, "`any

ambiguity . . . must emanate from the language used in the contract rather than from one party's subjective perception of the terms.'" Id. at 559 (citation omitted); Schultz v. Hartford Fire Ins. Co., 213 Conn. 696, 702-03 (1990) ("If . . . the words in the policy `are plain and unambiguous, the established rules for the construction of contracts apply, the language, from which the intention of the parties is to be deduced, must be accorded its natural and ordinary meaning, and courts cannot indulge in a forced construction ignoring provisions or so distorting them as to accord a meaning other than that evidently intended by the parties.'"). "`Although ordinarily the question of contract interpretation, being a question of the parties' intent, is a question of fact . . . [w]here there is definitive contract language, the determination of what the parties intended by their contractual commitments is a question of law . . . .'" Tallmadge Bros., Inc. v. Iroquois Gas Transmission System, L.P., 252 Conn. 479, 495 (2000). "Where . . . the parties to the

contract are sophisticated business entities, the Supreme Court

13

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 14 of 20

has recognized a presumption of definiteness in the words of the contract and has concluded that `the intent of the parties is to be ascertained by a fair and reasonable construction of the written words and . . . the language used must be accorded its common, natural, and ordinary meaning and usage where it can be sensibly applied to the subject matter of the contract.'" SCP Corp. v. BankBoston, No. X01CV980150598, 2001 WL 51655, at *2 (Conn. Super. Ct. Jan. 3, 2001) (quoting Tallmadge Bros., 252 Conn. at 498)). Furthermore, "`courts have been increasingly willing to flesh out the intended meaning of indefinite contract language by recourse to trade, custom, standard usage and past dealings . . . .'" Artman v. Output Technologies Solutions Eastern Region,

Inc., No. CV 000595362S, 2000 WL 992166, at *2 (Ct. Super. Ct. June 30, 2000) (citation omitted). "Evidence of trade usage may

be material to the parties' intention concerning the meaning of a term if `the parties knew or ought to have known of a business usage corresponding to a particular provision inserted in their contract.'" James A. Manafort, JR., PPA et al. v. Essex

Insurance Company, No. CV000504675S, at *5 (Ct. Super. Ct. July 20, 2001) (citation omitted). Here, Sections 1.10 and 3.1 of the Agreement, read together, provide in clear and unambiguous language that NRG is responsible for payment of congestion charges. Section 1.10 states in clear

14

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 15 of 20

and unambiguous terms that NRG is obligated to deliver SOS Requirements Power, as that term is defined in Section 3.1. In

turn, Section 3.1 states in clear and unambiguous terms that SOS Requirements Power includes "congestion charges imposed under the NEPOOL Transmission Tariff." NRG's obligation to pay congestion

charges is then repeated in Section 3.10 of the Agreement, which states that NRG shall pay all NEPOOL charges associated with the provision of SOS Requirements Power; the definition of Delivery Services in Section 1.4 makes it clear that the exception in Section 3.10 does not relieve NRG of the obligation to pay congestion charges. This clear and unambiguous language providing that NRG is responsible for payment of congestion charges is consistent with Section 3.12 of the Agreement, which covers how NRG's portion of any rebates of congestion charges will be determined. Inclusion

in the Agreement of a provision for payment of any rebates of congestion charges to NRG and not CL&P makes sense only if NRG, and not CL&P, is the party paying the congestion charges. NRG advances numerous arguments in an effort to import ambiguity into the Agreement. However, NRG never suggests a

reasonable alternative interpretation of the above-referenced language in Sections 1.10 and 3.1 and 3.10 of the Agreement. simply ignores that language. Among NRG's arguments is one that allocation to NRG of the It

15

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 16 of 20

responsibility for paying congestion charges is inconsistent with the general purpose of the Agreement, which is to set forth NRG's responsibility to deliver power to defined Delivery Point(s), and congestion charges is more associated with transmission than with generation of power. NRG points to particular provisions of the

Agreement that are consistent with its point that congestion charges is more associated with transmission than with generation of power and argues that interpreting the Agreement to make NRG responsible for paying congestion charges is inconsistent with those provisions. That is not the case. The fact that certain

provisions of the Agreement reflect that congestion charges is more associated with transmission than with generation of power does not preclude the parties from agreeing that, notwithstanding that fact, NRG will be responsible for payment of congestion charges. That is what CL&P and NRG did here, and unlike the

interpretation urged by NRG, such an interpretation of the Agreement does not ignore or distort any of its provisions. NRG argues that the Agreement is ambiguous because the term "congestion charges" is not defined in the Agreement, and also that the Agreement cannot contemplate payment by NRG of congestion charges because it contains no mechanism for billing and collection of congestion charges. NRG argues that the

Agreement is ambiguous about whether the phrase "congestion charges" was intended by the parties to mean the socialized

16

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 17 of 20

transmission congestion charges imposed on CL&P under the NEPOOL OATT. However, Section 3.1 of the Agreement explicitly includes

as part of SOS Requirements Power "congestion charges imposed under the NEPOOL Transmission Tariff," and there is no genuine issue as to the fact that, at all times pertinent to the complaint, congestion charges were socialized under the NEPOOL OATT. As to NRG's argument that the Agreement contains no

mechanism for billing and collection of congestion charges, the court notes first, that there is no question as to how congestion charges will be determined, i.e. they will be the charges imposed under the NEPOOL Transmission Tariff administered by ISONE, and second, that there are other charges or expenses included in the definition of SOS Requirements Power and there is no mechanism explicitly set forth in the Agreement for billing and collection of those charges or expenses either. While NRG might be able to

create a genuine issue as to the mechanism for billing and collection of congestion charges, that is quite different from an ambiguity in the Agreement as to which party is responsible for payment of congestion charges. NRG also points to the August 25, 1999 communication from J.P. Morgan in support of its argument that there is a genuine issue as to whether the Agreement is ambiguous. The Connecticut

Supreme Court has stated, "[g]enerally . . . `we continue to adhere to the general principle that the unambiguous terms of a

17

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 18 of 20

written contract containing a merger clause may not be varied or contradicted by extrinsic evidence.'" Alstom Power, Inc. v.

Balcke-Durr, Inc., 269 Conn. 599, 610 (2004) (citation omitted). "The general rule of contract law remains that `a [merger] clause . . . is likely to conclude the issue [of] whether the agreement is completely integrated.'" Tallmadge Bros., 252 Conn. at 504.

In Tallmadge, the court found "that the parties' insertion of the merger clauses into the settlement agreement is conclusive evidence of their intent to create fully integrated contracts, and . . . the trial court's subsequent consideration of extrinsic evidence was improper." Id. at 504-05. The merger clause in

Section 19.1 of the Agreement establishes that the Agreement is fully integrated. Therefore, even if the answer to the question

posed to the J.P. Morgan representative supported Ganter's contention that NRG's understanding was that CL&P was responsible for congestion charges, such evidence would be inadmissible to contradict the unambiguous terms of the Agreement. Finally, NRG argues that CL&P is estopped from arguing that the Agreement provides that NRG should pay congestion costs. asserts that (1) in a proceeding before the DPUC, CL&P took a position inconsistent with its arguments in support of the instant motion; (2) in proceedings before the FERC, CL&P asserted that the Agreement is at least ambiguous with respect to who has the obligation to pay congestion costs; and (3) that CL&P NRG

18

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 19 of 20

acknowledged in letter agreements with other suppliers under the same contract that CL&P was responsible for payment of congestion costs. The court has considered each of these arguments and

finds them unpersuasive for the reasons set forth by CL&P in its opposition. Based on the foregoing, the court concludes that CL&P is entitled to summary judgment on Count I and Count II of the complaint. Because the court has determined that NRG was

responsible under the Agreement for paying congestion charges, and CL&P had the right to withhold disputed payments pursuant to Section 5.4 of the Agreement, the court also concludes that CL&P is entitled to summary judgment on all four counts of NRG's counterclaim. IV. Conclusion For the reasons set forth above, the Plaintiff the Connecticut Light & Power Company's Motion for Summary Judgment (Doc. No. 31) is hereby GRANTED. Judgment shall enter in favor

of CL&P on Counts I and II of the complaint and Counts I, II, III, and IV of NRG's counterclaim. The judgment shall declare

that NRG Power Marketing Inc. is obligated to pay for congestion charges imposed under the NEPOOL Transmission Tariff during the Term of the Standard Offer Service Wholesale Sales Agreement between the Connecticut Light and Power Company and NRG Power Marketing Inc. dated as of October 29, 1999.

19

Case 3:01-cv-02373-AWT

Document 73

Filed 07/20/2007

Page 20 of 20

The Clerk shall close this case. It is so ordered. Dated this 20th day of July 2007 at Hartford, Connecticut.

_______/s/AWT_______________ Alvin W. Thompson United States District Judge

20