Free Memorandum of Contentions of Fact and Law - District Court of Federal Claims - federal


File Size: 123.1 kB
Pages: 25
Date: April 21, 2006
File Format: PDF
State: federal
Category: District
Author: unknown
Word Count: 11,441 Words, 65,537 Characters
Page Size: Letter (8 1/2" x 11")
URL

https://www.findforms.com/pdf_files/cofc/639/55-2.pdf

Download Memorandum of Contentions of Fact and Law - District Court of Federal Claims ( 123.1 kB)


Preview Memorandum of Contentions of Fact and Law - District Court of Federal Claims
Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 1 of 25

Exhibit A1

Date 3/9/1993 2/6/1993 3/9/1993 undated 3/16/1993 3/26/1993 3/29/1993 4/2-4/6/93 5/4/1993

Document Type COP 1 CR COP COP 1 Ltr Ltr Ltr Dly Diary Memo Fragnet COP 2 Addendum 3 CR Memo Proposal Proposal Proposal Proposal COP 2 COP 2 Memo Dft Ltr Ltr Dly Diary Memo Fragnet COP 3 Pay App 1 Ltr Ltr Ltr Ltr Ltr Ltr Trans Ltr Ltr Ltr COP 4 Ltr COP 4 COP 4 COP 5 Notes Proposal Proposal COP 5 Letter Memo Memo Dly Rprt COP 6 Ltr Ltr COP 6 Ltr Minutes Ltr Memo Ltr Letter Note Dly Diary Fragnet COP 7 Ltr Ltr COP 7 COP 7 Letter Memo Ltr

Description Demo duct enclosure Bldg. F No Demo note Demo duct enclosure Bldg. F Draft TSG - re Bldg F demo duct enclosure DOL - re COP 1, DOL - re COP 1, DOL - re COP 1 re COP 1 Asbestos abatement Bldg. F re asbestos abatement work asbestos found asbestos found Asbestos removal Asbestos removal Asbestos removal Asbestos removal asbestos abatement Draft Cost verification for proposal by BCI for asbestos abatement DOL - re COP 2 DOL - re COP 2 Removal & disposal of asbestos containing material in Bldg F COP 2 Soil test and inspection (Rejected) Engeo - cost estimate Engeo - eval near surface soil moisture BCI - re soils engineer BCI - re soils engineer TSG - re excess moisture in subgrade TSG- accept R&C for soil investigation TSG - testing is part of allowance Engeo - request for change order BCI - re Engeo change order TSG - re Engeo change order Add'l earthwork service (voided) Calh - in receipt of soil engineers findings Add'l earthwork Draft Repair/Replace trimmer stud & plywood. Terminix treatment re COP 5 Pied Piper - re termites West. Exterm - re termites Repair/Replace trimmer stud & plywood. Terminix treatment TSG - Remove/replace damaged wood framing, treat of soil at perimeter of building and interior for termites DOL - Repair/replace studs/damaged wall parts discovered during demo of kitchen/culinary arts area of Bldg F. Repair or replace trimmer studs and damaged wall parts discovered during demolition in Bldg F.

A2

3/12/1993 10/29/1992 3/2/1993 3/3/1993 3/4/1993 3/4/1993 3/8/1993 3/11/1993 3/12/1993 3/25/1993 3/26/1993 3/29/1993 4/7-4/8/93 5/4/1993

A3

3/16/1993 3/12/1993 3/16/1993 3/17/1993 3/17/1993 3/18/1993 3/30/1993 3/31/1993 8/28/1993 9/7/1993 9/22/1993

A4

4/14/1993 4/12/1993 4/14/1993

A5

4/15/1993 4/6/1993 4/6/933 4/15/1993 4/19/1993 5/11/1993 5/12/1993 8/6/1993

A6

4/20/1993 4/12/1993 4/19/1993 4/20/1993 4/22/1993 4/23/1993 4/28/1993 4/28/1993 5/7/1993 5/20/1993 11/8/1994 4/30-5/14/93

Excavation support info.(voided & replaced by subsequent COP's) Calh - in receipt soils findings, price Calh - quotation for removing soil Excavation support info.(voided & replaced by subsequent COP's) BCI - notice of unusual site conditions 4/23/93 Progress Meeting TSG - re 4/19/93 meeting re moist soil DMJM - Rework site. BCI - detail re over-excavation Confirm COP 6 voided COP 6 Provide 3/8" GWD Bldg. F G&S - request change order TSG - re G&S Provide 3/8" GWD Bldg. F Draft TSG - Installation of 3'8" gypsum wallboard DOL - Install one layer of 3/8" drywall at various locations in Bldg F G&S - request change order

A7

4/23/1993 4/16/1993 4/21/1993 4/23/1993 4/28/1993 5/26/1993 7/16/1993

A8

6/4/1993 4/28/1993 5/7/1993 5/10/1993 5/11/1993 5/12/1993 5/14/1993 5/20/1993 6/4/1993 6/14/1993 5/17/1993 5/14/1993 5/26/1993 5/17-5/25/93 5/14/1993 5/21/1993 5/26/1993

Excavate pads N and L-! COP 8R1 TSG - re meeting re excess soil mositure Ltr Calh - Excavate pads due to existing saturated conditions Proposal Excavate pads Bldg. N & L-I COP 8R1 TSG - Moisture content higher than acceptable Letter DOL - NTP excavation Ltr Calh - costs for extra work Ltr Ltr BCI - forward Calh costs Revised to excavate pads N & L1 due to existing saturated conditions COP 8R1 DOL - re COP 8 Memo COP 9 Ltr COP 10 Dly Diary Ltr Ltr COP 10 Remove 1 pine tree (voided 6-23-93) Calh - quote to remove tree Add'l recompaction of pads Bldg. F & H Calh - costs for extra work Calh - extra work quoatation Add'l recompaction of pads Bldg. F & H

A9

A10

Page 1

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 2 of 25

Exhibit

Date 5/27-6/1/93 6/2-6/28/93 6/1/1993 6/28/1993 6/30/1993 6/29-7/6/93 7/6/1993 7/7/1993 7/7/93-8/26/93 8/26/1993 8/27-9/1/93

Document Type Dft COP 10 Dly Diary Dly Diary Letter Ltr Memo Dly Diary Transmittal Ltr Dly Diary Memo Dly Diary Fragnet COP 11 CR CR Ltr COP 11 COP 11 Memo Memo Memo Memo Ltr COP 12 Ltr Memo Ltr Memo Memo Memo Memo Memo Ltr Memo Memo COP 12 COP 12 Notes Letter Ltr Memo Memo Ltr Ltr Dly Diary Fragnet COP 13 Proposal COP 13 COP 13 Memo Letter Memo Ltr COP 14R CR Trans COP 14 Draft Letter Memo; CR Ltr Ltr Letter COP 14R Ltr Ltr Dly Diary Dly Diary Fragnet COP 15 Minutes Proposal Minutes COP 15 COP 15 Memo Memo Memo Memo Memo Memo Dly Diary Fragnet COP 16 Ltr Ltr Ltr COP 16 COP 16 Ltr Change Ord

Description Draft

TSG - Treat soil under extensions to Bldgs F & H using same procedure approved for Bldgs N & L2 TSG - move Bldg F to critical path DMJM - soils engineer's recommendation Accelerate pads at F&H BOL - re COP 10, et al Additional compaction at Building Pads COP 10 Removal of 7 Pine Trees remove pine trees? lines under trees Calh - quote to remove trees Removal of 7 Pine Trees Draft DMJM - re line of trees DMJM - re trees/permits BCI - rec'd verbal NTP DOL - Remove seven pine trees BCI - confirm NTP COP 11, et al Extended job costs, 53 days DOL - re weather delays DMJM - existing leases BCI - time lost between 2/4 and 3/22 DMJM - COP 12 comments DOL - Additional compensation for weather delays DOL - Weather Delay DMJM - Weather Delay DMJM - weather days due BCI - input re weather/DSC DMJM - analysis of delays DMJM - owner float Extended job costs, 53 days Draft COP 12 DOL - Response to Request for COP #12 BCI - weather delay an issue DMJM - bck-up for OH costs, early finish DMJM - whether time extension justified BCI - outstanding COPs DOL - response to ltr re remaining COPs COP 12 Asbestos abatement Bldg H Asbestos Removal Serv. Asbestos abatement Bldg. H Draft Asbestos Abatement Confirm verbal approval COP 11, 13, 16 DOL - Asbestos Abatement DOL - Asbestos Abatement Sound insulation Res-Com - sound insulation Res-Com - sound insulation changes Insulate Toilet, Laundry, Corridors (not recommended by TSG on 12/1/94) COP 14 TSG - Architect response to COR 14 for installation of acoustic installation. DOL - Fiberglass sound insulation in lieu of Thermafiber details of insulation BCI - clarify insulation DOL - review of COPS TSG - re COP 14 Sound insulation TSG - enclose COP 14R DOL - waiting further info

A11

5/27/1993 5/7/1993 5/15/1993 5/26/1993 5/27/1993 6/7/1993 6/9/1993 6/18/1993 6/24/1993 6/23/1993

A12

9/14/1993 3/26/1993 5/25/1993 6/1/1993 6/9/1993 7/6/1993 7/20/1993 7/20/1993 8/1/1993 8/12/1993 9/1/1993 9/1/1993 9/14/1993

10/29/1993 11/23/1993 4/19/1994 4/27/1994 3/10/1995 6/27/1995 2/16-6/4/93

A13

6/3/1993 5/27/1993 6/3/1993 6/23/1993 6/23/1993 7/6/1993 7;/7/93

A14

11/23/1994 4/16/1993 6/1/1993 6/3/1993 6/16/1993 7/6/1993 3/21/1994 3/22/1994 7/20/1994 7/22/1994 11/23/1994 12/1/1994 3/10/1995 2/27-3/1/94 3/28/1994

COP 14R1 Rev. to existing water line Progress Meeting Pacific Underground Progress Meeting Rev. to existing water line Draft DMJM - New water line DMJM - recommendation DMJM - Verification of modification cost proposal. DMJM - Need NTP DO:L - Provide revisions to existing water line DOL - Provide revisions to existing water line. COP 15 Remove unit heater and patch/cap as required. Greene - demo space heater TSG - provide price A&A - cost to remove heater Remove unit heater Bldg. F Draft BCI - confirm verbal approval COP 11, 13, 16 BCI to A&A

A15

6/3/1993 5/7/1993 5/17/1993 5/21/1994 6/3/1993 6/10/1993 6/30/1993 6/30/1993 7/1/1993 7/6/1993 8/26/1993 7/19-7/26/93

A16

6/3/1993 3/16/1993 3/18/1993 4/14/1993 6/3/1993 6/23/1993 6/23/1993

Page 2

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 3 of 25

Exhibit

Date 7/6/1993

Document Type Memo

Description DOL - re COP 16

A17

6/4/1993 6/4/1993 7/6/1993 6/17/1993 6/7/1993 6/7/1993 7/6/1993

COP 17 Ltr Memo COP 18 COP 18 Memo Memo Draft Ltr Memo COP 19 Transmittal Dly Diary Ltr Transmittal Transmittal Transmittal COP 19 COP 19 Memo Memo Fragnet COP 20 CR Trans Trans Ltr Proposal Memo Ltr COP 20 COP 20 Dly Diary Memo Memo Letter Fragnet COP 21 Proposal COP 21 COP 21 Notes Memo Memo Memo Memo COP 22 CR Proposal COP 22 COP 22 Note Memo Dly Diary COP 23R1 Ltr Ltr Ltr Memo Memo Memo Proposal COP 23R COP 23R Memo Letter Letter COP 24 Ltr COP 24 Notes Ltr Transmittal Memo Memo Memo Memo Dly Diary Fragnet COP 25 RFI RFI CR CR Proposal COP 25 COP 25 Notes Memo RFI Memo

Install 7 redwood trees (voided) Takehara - price for 7 trees DOL - re COP 17 Remove existing tree (voided) Draft DMJM - DOL doesn't want to fund change order DMJM - relax on tree and put utilities in TSG - DOL won't fund tree DOL - re COP 18 Additional work due to increased footing depth at Bldg M Provide plans BCI - in receipt of response to RFI 64 MCR - added cost to Bldg M Agorastos - depth change cost Grade elevation at SW corner of Building M is too low for the proposed footing placement. Additional work due to increased footing depth at Bldg M Draft DMJM - A/E sketches Correct the footing placement at southwest corner of Building M COP 19 Extra electrical work Location of Bldg L, L1 elec Ackerman - review proposed rerouting Akcerman - response to RFI 85 TSG - Sheet E.10, provide price for modifying underground elec Akcerman - quote for elec changes DMJM - revise site elec, this is critical Ackerman - we use Biddle for pricing Extra electrical work Draft DMJM - proposal generally in order DOL - re COP 20 Permits - lateral permit fee. Enlarged driveway permit. Expanded electrical service. COP 20 Scored/Split Face CMU/Bldg. N Inland - credit for change Scored/Split Face CMU/Bldg. N Draft Handwritten notes regarding 4 COPs - not identified DMJM - Masonry Credit DMJM - Verification of Cost DOL - Deletion of masonry units at Bldgs M and N DMJM - Verbal NTP Add'l 6" Clay Pipe & potholing can't tie 6' into 4" line PUC - add'l cost for 6" clay pipe Add'l 6" Clay Pipe & potholing Draft BCI - verbal approval DOL - Replace an existing 4" storm drainage line with a 6" line.

A18

A19

6/23/1993 5/13/1993 5/20/1993 5/27/1993 6/4/1993 6/8/1993 6/30/1993 6/23/1993 6/30/1993 7/30/1993

A20

7/13/1993 6/16/1993 6/22/1993 6/24/1993 6/28/1993 6/30/1993 7/1/1993 7/1/1993 7/13/1993 7/12-7/14/93 7/14/1993 8/26/1993 9/1/1993

A21

7/27/1993 7/22/1993 7/27/1993

8/17/1993 8/20/1993 8/25/1993 8/27/1993 A22 8/5/1993 8/3/1993 8/3/1993 8/5/1993 8/11/1993 8/16/1993 8/9-812/93 A23 1/21/1994 7/29/1993 7/29/1993 8/5/1993 8/20/1993 8/27/1993 10/14/1993 12/18/1993 1/20/1994 2/14/1994 2/14/1994 3/1/1994 A24 8/10/1993 8/6/1993 8/10/1993 8/17/1993 8/18/1993 8/18/1993 8/25/1993 8/25/1993 8/27/1993 8/19-8/27/93

Request for Substitution in domestic water line US Pipe - 3" iron unavailable PUC - 3 and 4" pvc rejected PUC - resubmittal for water line DMJM - Verification of Cost DOL - Substitute iron piping with pvc piping DMJM - Credit for PVC Water Line Substitution PUC - credit Request for Substitution in domestic water line Draft DOL - PVC Piping Substitution DOL - PVC Piping Substitution PVC Piping Substitution Add'l Electrical Work AEC - request change order for duct bank mods Add'l Electrical Work Handwritten notes regarding 4 COPs - not identified TSG - enclsoe COP 24 DMJM - Notes on COP 24 DMJM - need verbal NTP DOL - Rerouting of Site Utilities DOL - Rerouting of Site Utilities DMJM - Verbal NTP Cop 24 Fire Dampers North Wall - Hall #131 Bldg. N Fire Dampers 36x12 Grill Fire Dampers Supply Air Duct A&A - fire dampers Fire Dampers North Wall - Hall #131 Bldg. N Draft Fire dampers required by code DMJM - Add fire dampers at Bldg N use 12x12 diffuser DMJM - Building N - add fire dampers

A25

8/24/1993 3/16/1993 3/17/1993 3/18/1993 3/18/1993 7/27/1993 8/24/1993

8/25/1993 9/2/1993 11/19/1993

Page 3

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 4 of 25

Exhibit A26

Date 8/25/1993 7/29/1993 8/2/1993 8/5/1993 8/10/1993 8/18/1993 8/25/1993

Document Type COP 26 Ltr Ltr Ltr Transmittal Memo COP 26 COP 26 Notes Memo Memo COP 27 Transmittal CR Proposal Proposal COP 27 Notes Memo Dly Diary Dly Diary Letter Memo Fragnet COP 28 Memo RFI CR CR Trans Ltr Proposal COP 28 COP 28 Memo COP 29 CR CR Trans Ltr COP 29 COP 29 Ltr COP 30 COP 30 CR Proposal Proposal COP 31 Trans Dly Diary Trans PO Dly Diary Proposal COP 31 COP 31 Letter Change Order Memo Fragnet COP 32 CR Trans Ltr COP 32 COP 32 Notes Memo Ltr Memo Letter COP 33 CR Trans Ltr Memo Letter COP 34 Dly Diary CR Dly Diary COP 34 COP 34 Notes Memo Ltr Letter Letter

Description substitute trusses R&C - proposed substitutions Standard - re contract Standard - I-Joist substitution DMJM - Standard Structure letter I-Joist substitution request DMJM - Web Joist Substitution substitute trusses Draft Handwritten notes regarding 4 COPs - not identified by number DOL - Substitution of truss joint of different design than specified - resulting in a credit. DMJM - Joist Substitution Relocation of Vaults Ackerman - proposed reroute Relocate vaults Allied - relocate vaults AEC - relcate vaults Relocation of Vaults relocate vaults DMJM - Electrical Vaults at Building M

8/25/1993 8/27/1993 A27 9/1/1993 6/22/1993 8/10/1993 8/18/1993 8/25/1993 9/1/1993 9/10/1993 9/1/1993 9/16-9/21/93 10/11/1993 12/6/1993

TSG - Relocation of electrical vaults P6, T6, and FA6 DOL - Relocate Vaults COP 27 Provide one add'l Glulam Beam Relocate Hallway Fire Doors Stiles - Bldg M opening fire rating frie rating reduced glulam, post, header R&C - response to Bldg M door 125 TSG - R&C sketches Standard - add on GLB Provide one add'l Glulam Beam Draft DOL - re COP 28 Changes to Type 'A'&'B' windows and replace Type 'J' window all in Bldg. H A&B Windows E Line Opening DH of Sill for A&B windows Midwest - replace windows Changes to Type 'A'&'B' windows and replace Type 'J' window all in Bldg. H Draft TSG - mods re windows Rev. to Vault Location Draft relocate elec vaults Allied - move vaults Allied - add'l costs Add'l Reinforcement Bldg. H BCI - detail TSG - Bldg H footing dtails MCR MCR- rebar, travel Add'l Reinforcement Bldg. H Draft TSG - Additional reinforcing steel. Agorastos - increase depth of footings DOL - Reinforce Existing Electrical Line COP 31 Alcal Add'l Mfg. Need framing detail BCI - scupper detail Qalcal - increase in base flashing Alcal Add'l Mfg. Draft Additional base flashing at Bldg N DMJM - Bldg N additional builtup roofing TSG - enclose COP 32 DOL - Additional Roofing DOL - Additional Roofing Add'l Framing framing Stiles - quote to remake frame TSG - enclsoe COP 33 DOL - Additional Framing DOL - Additional Framing Add'l Misc. Carpentry framing Add'l Misc. Carpentry Draft Installation of ripping DMJM - Bldg N Clarify Size of Fascia TSG - enclose COP 34 DOL - Additional Carpentry on Bldg N Response to 7-6-94 letter

A28

8/31/1993 12/6/1993 4/26/1993 4/26/1993 4/26/1993 7/15/1993 7/21/1993 8/30/1993 8/31/1993 12/6/1993

A29

9/7/1993 5/7/1993 5/10/1993 8/24/1993 8/25/1993 9/7/1993 10/12/1993

A30

9/7/1993 8/10/1993 8/18/1993 8/25/1993

A31

9/24/1993 8/20/1993 8/23-8/24/93 8/24/1993 8/25/1993 8/25-8/26/93 9/2/1993 9/24/1993 10/11/1993 12/5/1993 12/6/1993

A32

10/8/1993 4/16/1993 8/25/1993 9/1/1993 10/8/1993

10/18/1993 12/14/1993 1/13/1994 1/25/1994 A33 10/13/1993 10/5/1973 10/14/1993 12/14/1993 1/13/1994 1/25/1994 10/13/1993 10/5/1993 10/5/1993 10/6/1993 10/13/1993

A34

A34

10/18/1993 12/14/1993 1/26/1994 7/20/1994

A35

10/27/1993

COP 35

Continuous Welding

Page 4

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 5 of 25

Exhibit

Date 8/24/1993 10/27/1993

11/11/1993 12/5/1993 11/9/1993 1/24/1994 1/25/1994 2/3/1994 2/7/1994 4/20/1994 4/26/1994 6/6/1994 6/14/1994 7/20/1994 7/26/1994 7/25/1994 A36 7/7/1994 9/27/1993 10/4/1993 10/11/1993 10/1/2193 11/5/1993 10/22/1993 10/29/1993

Document Type CR COP 35 COP 35 Notes Trans Quote Change Order Ltr Ltr Ltr Ltr Trans Ltr Memo Memo Letter Ltr Letter COP 36R1 Ltr CR Ltr Dly Diary Trans Dly Diary COP 36 COP 36 Notes Ltr Ltr Memo Ltr Ltr Ltr Ltr Ltr Ltr Trans COP 36R1 Ltr Ltr Ltr Change Order Ltr Ltr COP 37 Ltr Ltr Trans CR Trans Minutes Minutes Minutes Trans Trans COP 37 COP 37 Trans Minutes Trans CR Ltr COP List Trans COP 38 Minutes CR Ltr COP 38 COP 38 Ltr Memo Transmittal Memo Letter Letter COP 39 CR Trans COP 40 Memo Quote COP 40 Memo Minutes Minutes Ltr Ltr Minutes Minutes Minutes Minutes Minutes Minutes Memo

Description Continuous Welding Continuous Welding Draft Credit for reduced welding BCI - price shop fab Morris - field weld Morris provide channels BCI - need credit Morris - credit TSG - backup credit BCI - credit for welding BCI - we sent backup on welding credit TSG - enclose COP 35 DOL - Eliminate continuous welding at Bldg L2 DOL - re COP 35 Review COPs DOL - review COPS Response to 7-6-94 letter from CW to BB, re outstanding COPs. Review of records Susp. Cling Rms. 121,125 G&S - clarify gyp v. acoustical see attached G&S G&S - cost for suspended ceiling Tollner - costs to paint gyp Susp. Cling Rms. 121,125 Draft Conflict regarding ceilings TSG - evaluated COP 36 BCI - will seek credit DMJM - Bldg N - gyp board in lieu of tile ceilings rooms 121, 125 TSG - returned COP 36 BCI - please review COP 36 DOL - re COP 36 BCI - will try to submit as COP BCI - re credit for COP 36 BCI - release of Shaw Interiors BCI - re COP 36 Susp. Cling Rms. 121,125 DOL - review of COPs BCI - re Modification 10 DOL - re COP 36 Sheetrock DOL - response to 7/26/94 re COP 36 Florida Tile in Lieu of Olean Aztec - purple discontinued American - purple discontinued Aztec - purple discontinued re colors TSG - re color Progress Meeting Progress Meeting Progress Meeting Aztec - clarify floor tile pattern Aztec - add'l cost for Florida Tile Florida Tile in Lieu of Olean Draft Aztec - confirm floor tile colors Progress Meeting Aztec - advise color floor tile wall tile color TSG - tile colors COP 37 Void Azterc - floor tile colors BT Mancini 10 Roof Penetrations Progress Meeting roof penetrations Mancini - cost for 10 penetrations BT Mancini 10 Roof Penetrations Draft TSG - have not forwarded COP 38 Building N - Metal Roof Penetrations N Roof penetrations DOL - review COPs DOL - review COPs Response to 7-6-94 letter Furnish Cement Board VOID grout in conflict w/tile Aztec - quote for ement board replace doors DMJM - Add rebar at Bldg H footing Stiles - Replace HM Doors & Frames replace doors DMJM - Building M - Modify Doors & Frames 120 & 125 Site Daily Rprt Site Daily Rprt TSG - enclose COP 40 TSG - enclose pay app 10 Site Daily Rprt Dly Diary Site Daily Rprt Dly Diary Site Daily Rprt Dly Diary DOL - review COPs

11/4/1993 11/5/1993 11/22/1993 12/14/1993 1/20/1994 1/26/1994 4/15/1994 4/15/1994 4/19/1994 4/20/1994 7/7/1994 7/20/1994 7/26/1994 7/26/1994 8/12/1994 9/20/1994 3/10/1995 A37 10/29/1993 3/18/1994 4/19/1993 7/13/1993 7/19/1993 7/22/1993 9/21/1993 10/12/1993 10/26/1993 10/26/1993 10/27/1993 10/29/1993 11/2/1993 11/9/1993 11/10/1993 11/10/1993 11/10/1993 11/18/1993 11/30/1993 A38 11/3/1993 8/31/1993 8/31/1993 10/19/1993 11/3/1993 12/14/1993 11/24/1993 12/9/1993 1/13/1994 1/26/1994 7/20/1994 A39 11/3/1993 10/27/1993 11/3/1993 11/9/1993 9/27/1993 11/9/1993 11/9/1993 11/10/1993 11/11-11/12/93 11/15/1993 11/15/1993 11/15/1993 11/16/1993 11/16/1993 11/17-11/19/93 11/23/1993 12/29/1993 12/29/1993 1/13/1994

A40

Page 5

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 6 of 25

Exhibit

Date 1/26/1994 11/10/1993 10/25/1993 11/1/1993 11/2/1993 11/10/1993 11/18/1993 11/30/1993 12/2/1993 12/9/1993 1/13/1994 1/26/1994 11/10/1993 10/29/1993 11/1/1993 11/10/1993 11/18/1993 11/30/1993 12/16/1993 1/13/1994 1/26/1994 11/15/1993 10/12/1993 11/2/1993 11/3/1993 11/15/1993 11/15/1993 11/10/1993 11/18/1993 12/2/1993 1/13/1994 1/26/1994

Document Type Ltr COP 41 CR Transmittal Note COP 41 Ltr Dly Report Memo Transmittal Memo Letter COP 42 CR Dly Diary COP 42 Ltr Dly Report Memo Memo Letter COP 43 Minutes Ltr Ltr Ltr COP 43 Ltr COP 43 Ltr Memo Memo Letter COP 44 Transmittal COP 44 Letter Notes Memo Transmittal Memo Letter COP 45 Memo Ltr Transmittal Ltr Transmittal Proposal COP 45 COP 45 Addendum 1 Ltr Transmittal Memo Dly Report Memo Transmittal Memo Ltr Dly Diary Dly Diary Letter Memo Proposal Transmittal Memo Memo Memo Memo Tans COP 46 Ltr CR Dly Diary Dly diary Dly Diary Ltr Proposal COP 46 COP 46 Notes Memo Ltr Ltr Memo Letter Trans Notes Memo Trans Memo Memo Letter DOL - review COPs Add'l Gypsum Drywall Work Recessed lights Fixture anchorage G&S price Add'l Gypsum Drywall Work TSG - enclose COP 41

Description

A41

DMJM - Building M Light Fixture Supports DMJM - M framing for light fixtures DOL - Additional Gypsum board work DOL - Additional gypsum board work in Bldg M Pony Wall Framing Pony Wall Framing Pony Wall Framing TSG - enclose COP 42 DMJM - Building M Framing above Door 101 DOL - Provide pony wall framing DOL - Provide pony wall framing Patented Cores Progress Meeting Best - permanent keying Best - add'l cost TSG - re keying Patented Cores Midwest - add'l cost of cores Draft TSG - enclose COP 43 DMJM - Best- Patented Cores DOL - Upgrade of lock cylinder cores. Upgrade of Lock cylinder cores Add'l Electrical Work Bldg. M AEC - quote install new power outlets Draft DOL - Miscellaneous Outlets in Bldg M estimate DMJM - Additional outlets for temporary cafeteria DMJM - regarding KM's assessment of COPs DOL - Additional outlets in Building M DOL - Additional Outlets in Building M Add'l Electrical CMI Revision DMJM - Budget cost estimate DOL - NTP CMI BCI - with DOL NTP TSG - proposal request DMJM - latest CMI drawings AEC - Mods to Bldg E,G,H,N Add'l Electrical CMI Revision Draft DOL - to CMI revisions AEC - summary of delays DMJM - re CMI COP 45 DMJM - CMI Electrical Changes DMJM - AEC appears in order DMJM - COP 45 add'l info DOL - CMI revisions - additional electrical work TSG - enclose COP 45

A42

A43

A44

11/17/1993 11/16/1993 11/18/1993 11/22/1993 12/3/1993 12/14/1993 2/14/1994 3/3/1994

A45

11/19/1993 8/27/1993 10/15/1993 10/26/1993 10/18/1993 11/4/1993 11/15/1993 11/19/1993 11/22/1993 12/9/1993 12/15/1993 12/16/1993 12/21/1993 12/21/1993 1/6/1994 1/7/1994 1/11/1994 3/23/1994 3/25/1994 1/26/1994 3/16/1994 3/17/1994 7/27/1994 7/26/1994 7/27/1994 7/??/94 7/26/1994 8/5/1994

DOL - CMI Revisions (Additional electrical work) DMJM - CMI - Schedule/Delay AEC - hours for revision BCI - with memo from DMJM DMJM - cable at outlets DMJM - cable at outlets length of cable at outlets DMJM - cable at outlets AEC - work complete Add'l Notch Steel Canopy at Bldg. N TSG - re metal decking drawings re 2x2 angle

A46

11/19/1993 8/23/1993 1/12/1993 10/13/1993 10/18-10/19/93 10/22-10/25/93 11/11/1993 11/11/1993 11/19/1993

12/16/1993 1/11/1994 1/12/1994 2/14/1994 2/14/1994 3/15/1994 3/22/1994 4/5/1994 4/20/1994 6/15/1994 7/11/1994 7/20/1994

Hewatt - cost for canopy work Hewatt - cost for extra canopy work Add'l Notch Steel Canopy at Bldg. N Draft Labor involved with notching of steel edge angles at 2 different conditions on covered walkway at Building H. DMJM - Building N - Welding at Canopy Steel TSG - enclose COP 46 TSG - enclose COPs DOL - Add notching to steel at canopy of Building N DOL - Add notching to steel at canopy of Bldg N re CR 142 re COPs DMJM - Bldg N Canopy - Additional Welding BCI - COP 46 has been submitted DOL - Additional steel notching at canopy of Bldg N DOL - Additional Steel Notching at Canopy of Building N DOL - re outstanding COPs

Page 6

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 7 of 25

Exhibit

Date 7/26/1994

Document Type Ltr Fragnet COP 47 Minutes Minutes Report Report Minutes Minutes Minutes Transmittal COP 47 Notes Minutes Minutes Memo Memo Routing slip Letter Letter Transmittal Transmittal Ltr Letter Ltr Ltr COP 48 Proposal Trans proposal COP 48 Notes Memo Trans Memo Memo Letter Letter Letter Ltr Ltr Memo Ltr COP 49 CR RFI Trans CR RFI Trans Trans CR Proposal Ltr Ltr Proposal COP 49 Ltr Ltr Memo Notes Letter Memo Ltr Diary Diary Letter Ltr Memo Fragnet COP 50 CR Dly Diary Ltr COP 50 COP 50 Notes Letter Letter Memo COP 51 CR Dly Diary Notes COP 51 COP 51 Notes Memo Fragnet COP 52 CR Proposal COP 52 COP 52

Description DOL - re add'l steel COP 46 Quality Control Progress Meeting Progress Meeting Partnering Meeting Partnering Meeting Progress Meeting Progress Meeting Progress Meeting Status Quality Control Inspection Services Progress Meeting Partnering Meeting DMJM - Inspector Alternate DMJM - Partnering - Inspector Alternate DMJM - Building Inspector TSG - enclose COP 47 DOL - Inspector Alternate DMJM - Inspector Alternate DMJM with DOL comments DOL - response to COP 47 DOL - review COPs BCI - review COPs DOL - response to 3/10/95 SEA Heat - A - LITG AEC - extra elec work BCI - re partnering AEC - order heat lights SEA Heat - A - LITG Building N Heat/Light units re inspcetor re inspection DMJM - Building N - Add 5 Heat/Light Units DOL - Heat-A-Light units at Building N DOL - Heat-A-Light Units at Building N Heat-A-Light Units at Bldg N DOL - Response to 7-6-94 letter BCI - re COPs DOL - re COPs DOL - Heat-A-Light Units at Bldg N DOL - re 3/10/95 ltr Provide 48 Fan Light Units re A&A A&A duct riser TSG - response to duct riser A&A re M6.1 A&A exhaust fan Crs DMJM - fan/light fixtures response to duct riser AEC - fan/light units BCI - meet re toilet fans TSG - provide change order riser ducts, fan/lights AEC - fan/lights Provide 48 Fan Light Units AEC - re delays TSG - re 12/10 job site meeting DMJM - Bldgs L1/L3 - Add Fan/Light Units Bldgs L1/L3 - Add Fan/Light Units DOL - Bathroom Lighting Fixtures - Womens' Dormitories DOL - Provide fan light units DOL - Provide fan light units AEC AEC DOL review COPs BCI - review COPs DOL - Provide fan light units COP 49 Provide change of height of 2 type "D" windows at stairs in Bldg L-2 window at stairs Midwest - cost to change height Provide change of height of 2 type "D" windows at stairs in Bldg L-2 Draft Additional framing at Stairs 1 and 3 in Bldg L2 DOL - Change Height of Windows at Stair Nos. 1 & 3 in L2 DOL - Change Height of Windows at Stair Nos. 1 & 3 in L2 DOL - Change height of windows at Stair # 1 and 3 - Bldg L2 Provide additional framing per response to RFI 147, G east of Line B in Bldg F wall too high extra 2x4s Provide additional framing per response to RFI 147, G east of Line B in Bldg F Draft Additional framing for main dining area DOL - Additional framing for cafeteria partition in Bldg F COP 51 Cap Flash Bldg. F Column Line B need flashing A&A - cap flashing Cap Flash Bldg. F Column Line B Draft

A47

11/19/1993 8/24/1993 9/28/1993 9/27/1993 10/26/1993 10/2/1993 10/5/1993 10/12/1993 11/17/1993 11/19/1993 11/30/1993 12/1/1993 12/3/1993 12/10/1993 12/18/1993 1/11/1994 2/22/1994 2/22/1994 3/15/1994 3/15/1994 7/20/1994 3/10/1995 7/27/1995

A48

11/19/1993 11/15/1993 12/9/1993 11/15/1993 11/19/1993 12/3/1993 12/10/1993 12/16/1993 2/14/1994 2/14/1994 3/1/1994 7/20/1994 3/10/1995 3/10/1995 6/7/1995 6/27/1993

A49

11/20/1993 7/8/1993 7/6/1993 7/28/1993 8/2/?? 7/30/1993 8/2/1993 8/2/1993 8/30/1993 8/16/1993 8/25/1993 8/30/1993 9/24/1993 11/20/1993 12/9/1993 12./13/93 12/16/1993 12/22/1993 2/14/1994 2/14/1994 5/16-5/20/94 4/25-4/29/94 7/20/1994 3/10/1995 6/6/1995

A50

11/24/1993 10/28/1993 11/8-11/9/93 11/10/1993 11/24/1993

3/8/1994 3/9/1994 4/19/1994 A51 11/24/1993 10/20/1993 120/22-10/25/93 11/17/1993 11/24/1993

4/25/1994

A52

11/24/1993 11/17/1993 11/18/1993 11/24/1993

Page 7

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 8 of 25

Exhibit A53

Date 7/26/1994 11/15/1993 11/15/1993 11/15/1993 11/18/1993 11/19/1993 11/24/1993 12/7/1993 12/8/1993 12/9/1993 1/27/1994 2/15/1994 2/16/1994 3/3/1994 3/14/1994 4/14/1994 4/15/1994 3/24/1994 4/27/1994 6/6/1994 6/14/1994 6/28/1994 7/26/1994 7/26/1994 7/26/1994 7/26/1994 7/20/1994 8/1-8/4/94 8/11/1994 9/20/1994

Document Type COP 53R3 Dly Report Trans Dly Report Ltr Proposal COP 53 COP 53 Proposal Memo Memo Memo Invoices COP 53R2 Ltr Ltr Memo Ltr Trans Memo Memo Memo Proposal Letter COP 53R3 COP53 Ltr Memo Ltr Dly Diary Ltr Ltr Fragnet COP 54 CR Ltr COP 54 Notes Letter Memo Ltr Ltr COP 55 CR Ltr Ltr Ltr COP 55 COP 55 Ltr Memo Memo Letter Ltr COP 56 Dly diary Proposal COP 56 Memo Memo Ltr Letter Memo Ltr Ltr Ltr COP 57 CR Transmittal Ltr Ltr Ltr Transmittal Ltr Proposal Trans COP 57 COP 57 Memo Ltr Trans Ltr Trans Memo Mod 6 Memo

Description Interior Gas Line DMJM Ciari - proposals PUC - extra work DOL - re COP 53 PUC - extra work Repair leaking gas Draft Ciari - proposals DMJM - Gas to Bldgs F & J DMJM - Gas to Bldgs F and J Additional Gas Line work in Bldgs F and J Ciari - Gas Line Rev'd (Part Only) DOL - review COPs TSG - enclsoe COP 53 DOL - New Gas Service to Bldgs F & J BCI - confirm Ciari work complete Dwg P3.2x DMJM - new gas service DOL - Repair gas line leaks in Bldgs F and J DOL - review COPs Ciari DOL - review COPS interior gas line Draft BCI - signature on Mod 10 DOL - re 7/26/94 ltr DOL - review COPs TSG - enclose COP 53R3 DOL - re COPs COP 53R3 Add'l Facia Add'l info from BT Mancini need facia Mancini - cost for add'l material Add'l Facia Add'l info from BT Mancini Additional sheet metal for facia TSG - Additional 8" to metal fascia panel at Bldg N DOL - Additional sheet metal for facia Mancini - add;l costs TSG - recommend reject COP 54 Delete Food Service Equip. need plumbing layout add'l cost BCI - backcharge for time Raygal - deduct Delete Food Service Equip. Draft TSG - enclose COP 55 DOL - Delete of Kitchen equipment DOL - Delete of Kitchen Equipment DOL - Delete of Kitchen Equipment DOL - review COPs Add'l Work Transformer Problem AEC - main service change Add'l Work Transformer Problem DMJM - Power turnover of 10-29-93 - Overtime. DOL - Additional labor for transformer turnover DOL - Additional labor for transformer turnover DOL - review COPs DOL - review COPs DOL - review COPs BCI - review COPs DOL -review COPs Waterclosets Sill detail TSG - sill detail dwg TSG - modifications to windows DMJM - provide proposal to change water closets AmerStandard - re Claifornia law Dpet Water - copy of info sheet Ciari - with AmerStandard enclosure Ciari - waterclosets BCI - with Ciari price Waterclosets Draft DMJM - Water Saving Water Closets TSG - enclose COP 57 DMJM - ixtures being installed BCI - need direction on COP 57 DMJM - need NTP for COP 57 - BCI - verbal NTP DOL - Water Saving Toilets Add'l Work Footings Wall at Bldg. F utilities at footing DMJM R&C - footing detail BCI - need direction for footing Provide corrective work to structural steel at Bldg F. Draft MCR - change to footing Agortastos DMJM

A54

11/30/1993 4/16/1993 10/27/1993 11/30/1993 12/9/1993 2/14/1994 5/4/1994 7/8/1994

A55

11/11/1993 3/3/1993 10/27/1993 11/19/1993 11/23/1993 11/11/1993 12/9/1993 2/14/1994 2/14/1994 3/3/1994

A56

12/2/1993 10/29-10/30/93 11/15/1993 12/2/1993 12/3/1993 1/7/1994 1/7/1994 3/10/1995 6/6/1995 7/7/1994 3/10/1995 7/27/1995 12/2/1993 5/7/1993 8/24/1993 10/12/1993 11/11/1993 11/16/1993 11/24/1993 12/2/1993 11/29/1993 11/30/1993 12/2/1993 12/3/1993 12/9/1993 12/9/1993 12/13/1993 12/14/1993 12/17/1993 2/28/1994 1/3/1994

A57

A58

COP 58 CR Dly Report Trans Memo COP 59 COP 59 12/3/1993 Proposal 12/5/1993 Proposal 12/6-12/9/1993 Dly Report

12/3/1993 11/19/1993 11/19/1993 11/27/1993 12/3/1993 12/6/1993

Page 8

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 9 of 25

Exhibit

Date 12/9/1993 12/10-12/14/93 12/9/1993 12/15-12/17/93 12/17/1993 12/20-12/21/93 1/4-1/12/94 137/1994

Document Type Ltr Dly Report Letter Dly Report Memo Dly Report Dly Report Memo Fragnet COP 59 Report Proposal Proposal COP 59 COP 59 Notes Ltr Memo Letter Letter

Description TSG - enclose COP 58 DMJM TSG - enclose COP 58 DMJM vebal NTP DMJM DMJM DOL - Site Wall Footings COP 58 Provide corrective work to structural steel at Bldg F. Hewatt - hours for week Hewatt - extra work Hewatt - modify steel Provide corrective work to structural steel at Bldg F. Draft Labor to reposition tower steel to pick up roof joists TSG - enclose COP 59 DOL - Provide corrective structural steel Building F DOL - Provide corrective structural steel - building F DOL - Provide corrective structural steel Building F Fire Damps/N. Hall #131 Bldg. F A&A - fire dampers 36x12 grille fire dmapers 36x12 grille Greene - response to CRs A&A - fire dampers Fire Damps/N. Hall #131 Bldg. F Draft TSG - enclose COP 60 DMJM - notes for COP 60, 63, & 69 DMJM - pp. 2, 3 NTP A&A - fire dampers DOL - Provide Fire Dampers COP 60 Add'l Framing & sheet Mat window opening sill detail TSG - sill detail dwg TSG - change window A&A Add'l Framing & sheet Mat Draft TSG - have reviewed COP 61 A&A - sill flashing Add'l Framing & sheet Mat TSG - enclose COP 61 DOL - Provide additional framing and sheet metal DOL - Provide additional framing and sheet metal DOL - Provide additional framing and sheet metal DOL - review COPs BCI - DOL reviewing proposal BCI - DOL reviewing proposal COP 61R1 Provide a cricket per reply to CR 170 need cricket

A59

12/6/1993 11/18/1993 11/29/1993 11/29/1993 12/6/1993

12/9/1993 2/14/1994 2/14/1994 3/3/1994 A60 12/6/1993 3/16/1993 3/17/1993 3/18/1993 3/18/1993 9/2/1993 10/28/1993 12/6/1993

COP 60 RFI CR CR CR Memo Proposal COP 60 COP 60 12/9/1993 Ltr 12/14/1993 Transmittal 12/14-12/17/93 Dly Report 12/17/1993 Memo 12/20/1993 Dly Diary 2/14/1994 Change Order 1/3/1994 Memo Fragnet 12/6/1993 5/10/1993 5/7/1993 8/24/1993 10/12/1993 10/28/1993 12/6/1993 12/9/1993 1/31/1994 1/13/1994 1/14/1994 2/2/1994 2/14/1994 3/8/1994 3/9/1994 4/14/1994 4/15/1994 4/20/1994 COP 61 CR CR Trans Ltr Proposal COP 61 COP 61 Ltr Proposal COP 61R1 Ltr Dly Report Memo Letter Letter Memo Draft Ltr Fragnet COP 62 CR Dly Report Dly Report Dly Report COP 62 COP 62 Notes Ltr Transmittal Memo Letter Letter Transmittal Memo Ltr Change Order Ltr COP 63 RFI RFI CR Memo Memo Trans Proposal COP 63 COP 63 Ltr Transmittal Memo Memo Change Order COP 64R1 Ltr Ltr Proposal

A61

A62

12/6/1993 11/17/1993 11/17/1993 11/22-11/24/93 11/29/1993 12/6/1993

12/9/1993 1/5/1994 2/14/1994 2/14/1994 3/1/1994 1/21/1994 2/14/1994 2/14/1994 3/23/1994 5/1/1994 A63 12/6/1993 8/2/1993 7/7/1993 8/3/1993 9/2/1993 9/2/1993 9/21/1993 10/28/1993 12/6/1993 12/9/1993 12/14/1993 12/17/1993 1/3/1994 2/14/1994 A64 12/20/1993 11/11/1993 11/23/1993 12/3/1993

Provide a cricket per reply to CR 170 Draft Additional crickets at Bldg F TSG - enclose COP 62 DMJM - comments of 12-16-93 Installation of roof crickets at Building F. Installation of roof crickets at building F Installation of roof crickets at bldg F re Alcal quote DOL -review COPS DOL - review COPS Alcal - provide cricketws BCI - updated punch list Diffusers (2) A&A - clearance from waste vents A&A - 36x16 grille attach A&A RFI Greene - response to RFIs Greene - resposne to RFIs TSG - respnse to RFIs A&A - diffusers Diffusers (2) Draft TSG - enclose COP 63 DMJM - Side Wall Diffusers NTP DOL - Side Wall Diffusers A&A gravel path DMJM - provide proposal BCI - provide proposal Calhoun -

Page 9

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 10 of 25

Exhibit

Date 12/6/1993 12/9/1993 12/9/1993 12/9/1993 12/9/1993 12/15/1993 12/20/1993 12/22/1993 12/22/1993 12/27/1993 1/7/1994 1/12/1994 2/17/1994

Document Type COP 64 COP 64 Memo Ltr Transmittal Memo Transmittal COP 64R1 Letter Memo Ltr Letter Site Visit Ltr COP 65 Dly Report CR Work Order COP 65 COP 65 Notes Ltr Memo Letter Letter

Description gravel path Draft DMJM - Temporary walk at east property line TSG - enclose COP 64 DMJM - Temp walk DMJM Calhoun - revised quote gravel path BCI - Temporary Walkway at East Property Line DOL - Temporary walkway DOL -review COPs DOL - Temporary walkway TSG - Weekly meeting DOL - re COP 64 Provide additional work per reply to CR 175 plaster cracking Fisher & Thiel Crack Bldg. N W. Wall Canopy Draft Installation of a metal control joint TSG - enclsoe COP 65 DOL - Installation of metal control joints DOL - Installation of metal control joints DOL - Installation of metal control joints

A65

12/14/1993 11/11/1993 11/17/1993 12/13/1993 12/14/1993

12/14/1993 2/14/1994 2/14/1994 3/4/1994

A66

8/15/1994 9/24/1993 10/5/1993 12/2/1993 12/14/1993 12/14/1993 1/13/1994 4/21/1994

4/27/1993 7/7/1994 7/20/1994 8/15/1994 8/19/1994 8/25/1994 10/3/1994 10/3/1994 A67 12/14/1993 11/17/1993 12/3-12/6/93 12/6/1993 12/7-12/8/93 12/7/1993 12/14/1993

COP 66R1 CR RFI Proposal Ltr Ltr Ltr COP 66R1 Notes COP 66R1 Ltr Ltr Letter COP 66R1 Ltr Memo Ltr Ltr COP 67 CR Dly Report Trans Dly Report Ltr COP 67 COP 67 Notes Memo Ltr Change Order Fragnet COP 68 Minutes Minutes Proposal Ltr Minutes Trans Minutes Dly Report Minutes Proposal COP 68 COP 68 Ltr Letter Memo Memo Change Order Minutes

Relocate AC unit on Bldg H Bldg H Header A&A - relocate AC Alcal - move AC BCI - cost impact BCI - cost impact A&A - no cost impact Relocate AC unit on Bldg H Additional framing to support AC unit in existing roof structure Draft TSG - enclose COP 66 BCI - ductwork credit DOL - review COPs Relocate A/C A&A - credit DOL - review COPs DOL - review COPs TSG - enclose COP 66R1 Rock Fill - Bldg. M & F sidewalk ramp TSG - revised grades Calhoun - price Rock Fill - Bldg. M & F Draft Additional rock to raise grade in the area to a height above footing DOL - Provide rock fill to accommodate grades DOL - Provide rock fill to accommodate grades Calhoun - price COP 67 TCU & CMI Mods Arch, Changes Progress Meeting Progress Meeting Midwest G&S - credit Progress Meeting Stiles - quotes and details Progress Meeting Progress Meeting DASCO TCU & CMI Mods Arch, Changes Draft TSG - enclose COP 68 DOL - review COPS DOL - TCU Modifications DOL - review COPS DASCO TSG -Meeting report

2/14/1994 3/4/1994 4/13/1995

A68

12/13/1993 10/5/1993 10/26/1993 10/26/1993 10/28/1993 11/2/1993 11/9/1993 11/9/1993 11/11/1993 11/23/1993 12/7/1993 12/13/1993 12/14/1993 1/26/1994 1/7/1994 1/7/1994 2/11/1994 4/7/1994

A69 11/22/1993 11/22/1993 11/30/1993 12/13/1993 12/14/1993 12/14/1993 12/17/1993 1/3/1994 A70 12/20/1993 11/12/1993 11/12/1993 11/12/1993 11/24/1993 12/15/1993 12/20/1993 CR RFI Ltr COP 69 COP 69 Transmittal Ltr Memoq NTP Memo COP 70 Ltr Ltr Ltr CR Ltr COP 70 COP 70 Ceiling Framing Ceiling Framing G&S - price Ceiling Framing Draft DMJM TSG - enclose COP 69 DOL -Ceiling Framing 1 HA Sheetrock enclosure AEC - recessed fixtures AEC - changed fixture AEC - fixture problems fjire rating of fixtures G&S - quote 1 HA Sheetrock enclosure Draft

Page 10

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 11 of 25

Exhibit

Date

Document Type Notes Memo Transmittal Memo Transmittal Ltr Memo Dly Diary Memo Dly Diary Ltr Dly Diary Dly Diary Ltr Dly Diary Transmittal Memo Memo Memo Letter Letter Change Order Fragnet

1/5/1994 1/19/1994 1/19/1994 1/2/494 1/27/1994 2/3-2/8/94 2/8/1994 2/9-2/17/94 2/17/1994 2/18/1994 2/22-4/14 4/15/1994 4/15-4/20/94 4/20/1994 6/8/1994 6/16/1994 7/11/1994 7/19/1994 7/26/1994 8/12/1994

Description Labor and material for providing gypsum board enclosures behind recessed fixtures required to maintain 1 hr rated ceiling. BCI - re delay DMJM DMJM - One hour ceilings at recessed light fixtures DMJM - need NTP BCI - re delay DOL - NTP DMJM - cost verification G&S - price

BCI - re cost BCI - still negotiating DMJM - proposal reasonable DOL - review COPs DOL - review COPSs DOL - review COPs DOL - review COPs G&S COP 70

A71

10/5/1994 12/22/1993 11/30/1993 11/30/1993 12/1/1993 12/15/1993 12/20/1993 12/20/1993 12/22/1993 12/22/1993 12/22/1993 12/22/1993 1/12/1994 1/17/1994 2/22/1994 4/11-4/28/94 6/27/94 Ltr 7/13/1994 7/18/1994 7/21/1994 7/20/1994 9/19/1994 10/5/1994 10/6/1994 11/9/1994 3/10/1995 11/18/1997

Tub/Shower COP 71R Tub/Shower COP 71 DMJM - Tub/Shower Surround Memo DMJM - Tub/Shower Transmittal DMJM - Shower Surround Transmittal DMJM - update action items Transmittal Ciari - info re fixtures Letter Ciari - Add for Tub/Shower Combo Proposal Tub/Shower COP 71 Notes on 71 (now voided) superseded by 119 Notes DOL - Tub/Shower Enclosures Letter DOL - Tub/Shower Enclosures Letter BCI - impact of Addendum 2 Ltr DOL - Tub/Shower Enclosures Letter Ciari - submittal Transmittal KM note - split the difference Transmittal Dly Diary DOL - review COPs Ciari - re Addendum 2, enclos cut sheets Ltr revisit COP 71 Transmittal TSG - Reconsideration of rejection of COP 71 Letter DOL - review COPs Letter Ciari Invoice Tub/Shower Enclosures COP 71R BCI - modify previous tub proposal Memo TSG - Tub/Shower enclosures Letter BCI - review COPs Ltr Tub/Shower Surround Estimate COP 72 CR LTr Proposal COP 72 COP 72 Notes Ltr Dly Diary Dly Diary Memo Letter Fragnet COP 73 Proposal Minutes COP 73 COP 73 Transmittal Dly Diary Memo Ltr Memo Fragnet COP 74 Proposal Minutes COP 74 Minutes COP 75 CR Proposal Memo COP 75 Notes Dly Diary Letter Notes Memo Letter Ltr Ltr Fragnet Add'l Stucco Work at Bldg. End trowel coat F&T - re detail 1/A12.1 F&T - cost breakdown Add'l Stucco Work at Bldg. End Draft Additional stucco work TSG - enclose COP 72

A72

1/10/1994 11/22/1993 11/22/1993 12/28/1993 1/10/1994

1/14/1994 2/3-2/4/94 2/15/1994 4/19/1994 7/20/1994

DOL - Additional stucco work at Bldg #6 DOL - review COPs COP 72 Temp Phone AEC - temp phone Progress Meeting Temp Phone Draft DMJM - Telephone service NTP BCI - proposal no longer valid DOL - Temporary phone service for the subject center. COP 73 Battery Packs AEC - price Progress Meeting Battery Packs Progress Meeting Reglet & Flashing Bldg. F detail for reglet A&A - quote TSG - attach dwg CD11 Reglet & Flashing Bldg. F Installation of metal reglet TSG - enclose COP 75 estimate DOL - review COPs DOL - review COPs BCI - review COPs DOL - review COPs COP 75

A73

1/12/1994 1/11/1994 1/11/1994 1/14/1994 1/17/1994 1/17-1/19/94 1/25/1994 1/26/1994 2/4/1994

A74

1/17/1994 1/10/1994 1/11/1994 1/17/1994 3/29/1994 1/17/1994 12/21/1993 1/12/1994 1/13/1995 1/17/1994 1/17-1/19/94 2/4/1994 3/24/1994 4/19/1994 7/20/1994 3/10/1995 6/27/1995

A75

Page 11

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 12 of 25

Exhibit A76

Date 6/30/1993 7/1/1993 8/23/1993 8/24/1993 11/2/1993 12/21/1993 12/29/1993 1/13/1994 1/17/1994 1/31/1994 2/8/1994 2/14/1994 4/14/1994 4/18/1994

Document Type COP 76 Ltr Trans Trans CR Ltr Proposal Trans Ltr Ltr Memo Minutes Letter Memo Memo

Description Draft - Add'l Elec' Work Replace. Circuit Breakers Peninsula - wiring size A&A - need wiring size BCI - need wiring size circuit overload Ackerman - clarify wiring size Ackerman - circuit changes Ackerman - re agreement BCI - agree with Ackerman AEC - confirm amount MDJM - Upgrade electrical to heat pumps Progress Meeting DOL - Upgrade electrical to heat pumps, Bldgs L1, L2 & L3 SOL - Upgrade circuit breakers and increase feeder size review COPs

A77 1/13/1994 1/13/1994 1/19/1994 Proposal Proposal COP 77 COP 77 Notes Okeefe Okeefe Alternate Roof Ladder Draft Labor and materials required for two ladders in men's dorms

2/4/1994 3/8/1994 3/9/1994 4/14/1994 4/19/1994 A78 1/20/1994 11/24/1993 11/30/1994 12/16/1993 1/11/1994 1/20/1994

TSG - enclose COP 77 Letter DOL - Provide Two Additional Roof Ladders Letter DOL - NTP Ltr DOL - Provide an alternate roof ladder Memo Memo - review COPs H.M. DR. FRMS at Bathrooms L-1 & L-3 bathroom framing Progress Meeting Stiles - quote Progress Meeting H.M. DR. FRMS at Bathrooms L-1 & L-3 Modifying 36 door frames DMJM - Bathroom Door Frames L1, L3 DOL - Bathroom Door Frames - Bldgs L1 & L3 DOL Revise hollow metal door frames

COP 78 CR Minutes Trans Minutes COP 78 Notes 1/31/1994 Memo 2/14/1994 Letter 4/19/1994 Memo 4/28/1994 Dly Diary 5/3/1994 Dly Diary 5/9-5/10/1994 Dly Diary 5/20/1994 Change Order 5/25-5/26/94 Dly Diary 6/3/1994 Dly Diary 6/7/1994 Dly Diary 6/10/1994 Dly Diary 6/13/1994 Dly Diary 1/20/1994 10/29/1993 11/24/1993 12/13/1993 12/13/1993 12/22/1993 12/29/1993 1/20/1994 1/31/1994 2/14/1994 3/8-3/9/1994 3/14-3/17/94 4/18/1994 4/19/1994 COP 79 CR CR Ltr Trans Trans Proposal COP 79 Notes Memo Letter Dly Report Dly Report Memo Memo Fragnet COP 80 Ltr Ltr Trans Proposal COP 80 COP 80 Notes Minutes Memo Letter Letter

Stiles

A79

Cornice Chase Bldg. L-2 Pony wall Soffit framing TSG - provide proposal R&C - storefron detail TSG - responses G&S Cornice Chase Bldg. L-2 Hardware required by code DMJM - L2 Cornice Chase DOL - Cornice Chase - Bldg L2

DOL - Provide cornice chase at Bldg L2 DOL - review COPs COP 79 Provide hardware changes to group 31 hardware Midwest - change in lockset BCI - modifiy Group 31 hardware BCI - ltr from TSG Midwest - change in lockset Provide hardware changes to group 31 hardware Draft re double doors Progress Meeting DOL - Provide hardware changes to group 31 hardware. DOL - Provide Hardware Changes to Group 31 Hardware DOL - review COPS

A80

1/20/1994 8/6/1993 8/25/1993 9/8/1993 9/27/1993 1/20/1994

4/12/1994 6/6/1994 7/20/1994 7/28/1994

A81

3/1/1994 1/12/1994 1/24/1994 1/28/1994 2/1/1994 2/4/1994 2/14/1994 3/1/1994 3/9-3/10//94 4/14/1994 4/27-5/3/94 6/15/1994 6/16/1994 7/20/1994 6/27/1995

COP 81R1 Ltr COP 81 Notes Ltr Memo Ltr Letter COP 81R1 Dly Diary Ltr Dly Diary Memo Memo Letter Ltr Fragnet COP 82 CR Trans

Ext. Window Awnings Revised 81R TSG - submit proposal Ext. Window Awnings Labor to cut plywood in order to recess metal frame Anchor - credit DMJM - L1 Awning changes TSG - COPs returned DOL - Awning Changes - Bldg L1 Ext. Window Awnings Revised 81R BCI - add'l info DOL - Awning Changes - Bldg L1 DOL - Awning Changes - Bldg L1 DOL - review COPs DOL - review COPs COP 81 Provide counter flashings on M & N in accordance with directive in CR 45 need framing detail BCI - scupper detail

A82

1/24/1994 4/16/1993 8/25/1993

Page 12

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 13 of 25

Exhibit

Date 9/10/1993 9/20/1993 12/22/1993 12/27-12/28/93 1/13/1994 1/26/1994 1/24/1994 8/12/1994

Document Type Proposal Ltr Dly Diary Dly Diary Proposal Ltr COP 82 COP 82 Ltr Fragnet Notes COP 83 CR Dlt Diary Proposal COP 83 COP 83 Notes Letter Memo Letter Letter Change Order Fragnet COP 84 Trans Trans Dly Diary CR Dly Diary Extra Time Proposal COP 84 COP 84 Notes Ltr Ltr Ltr Memo Mod 9 Fragnet COP 85 CR RFI CR Proposal COP 85 COP 85 Notes Ltr Ltr Ltr COP 86 CR Ltr Proposal COP 86 COP 86 Ltr Memo Transmittal Memo Letter Memo Ltr Change Order Letter COP 87 CR Trans Notes COP 87 COP 87 Notes Ltr Ltr Ltr Ltr

Description Alcal - scuppers BCI - need price

A&A - reglet & counterflashing BCI - forwarding COP 82 Counter Flashing Bldg. M & N Draft TSG - enclose COP 82 COP 82 Counter flashings 24 Ga. Gravel Stop & 2 Ladders need closer detail A&A - gravel stop 24 Ga. Gravel Stop & 2 Ladders Draft Raising steel channels at head of glass block TSG -enclose COP 83 DOL - Provide 24 gauge gravel stop and 2 saddles DOL - Provide 24 Gauge Gravel Stop & Two Saddles DOL - review COPS A&A - gravel stop COP 83 Provide raising of channel frames. BCI - detail from Hewatt R&C - proposed fix glass block channel Morris Morris - field weld Raise Channel Frms. Draft glass block channel TSG - head channel at wrong elevation BCI - disagree re COP 84 TSG - enclose COP 84 DOL - review COPS COP 84 Provide reglet and counter flashing on M between column lines D and 2 on Drawing A9.2 reglet and counterflash A&A - reglet and counterflash glass block channel A&A - reglet and counterflash Reglet & Counter Flashing, Bldg. M Draft Counter flashings TSG - COPs returned BCI - add'l info FOL - review COPs Smaller Heat Pump Units HP units not shown TSG - enclsoe COP 86 A&A - heat pumps Smaller Heat Pump Units Draft TSG - COPs returned DMJM - L2 smaller heat pumps DMJM - L2 - Smaller heat pumps DOL - Provide smaller heat pumps per reply to CR 196 DOL - Provide smaller heat pumps per reply to CR 196 DOL - Provide smaller heat pumps at Bldg L2 BCI - outstanding COPs A&A - heat pumps DOL - review COPs Additional framing Parapet detail entry detail work at entry Add'l Framing Draft Additional bracing required for glass storefront walls TSG - COPS returned BCI - scope changed BCI - re COP 87 TSG - enclsoe COP 87

A83

1/24/1994 10/29/1993 12/20/1993 1/13/1994 1/24/1994

2/4/1994 6/6/1994 7/20/1994 7/26/1994 8/16/1994

A84

1/24/1993 11/5/1993 11/5/1993 11/23-11/24/93 11/24/1993 11/29-12/3/93 12/1/1999 12/20/1993 1/24/1994

2/4/1994 4/14/1994 4/19/1994 4/25/1994 6/14/1994

A85

1/24/1993 9/24/1993 9/24/1993 11/24/1993 1/13/1994 1/24/1994

2/4/1994 4/19/1994 7/20/1994 A86 1/24/93(sic) 12/8/1993 4/21/1994 1/13/1994 1/24/93(sic) 2/4/1994 2/14/1994 3/3/1994 3/9/1994 3/9/1994 6/6/1994 3/16/1994 8/12/1994 7/26/1994 A87 1/24/93 (sic) 5/10/1993 1/13/1994 1/19/1994 1/24/1994

2/4/1994 3/17/1994 4/14/1994 4/19/1994

6/14/1994 7/26/1994 7/20/1994

Memo Letter Ltr Fragnet COP 88 CR Proposal COP 88 COP 88 Notes Ltr Ltr Ltr Ltr Memo

DOL - Additional framing at Bldg H partitions DOL - review COPs DOL - review COPs COP 87 Provide metal "Z" flashing at Bldg F reglet detail A&A - Metal "2" Flashing Bldg. F Provide metal "Z" flashing at Bldg F as per directive provided in CR 203 Draft Labor and material to remove and replace existing cap flashing at Bldg F TSG - COPS returned A&A - Metal "2" Flashing Bldg. F BCI - add'l response TSG - enclose COP 88 DOL - review COPs

A88

1/24/1993 12/21/1993 1/19/1994 1/24/1993

2/4/1994 3/21/1994 4/14/1994 4/19/1994 4/25/1994

Page 13

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 14 of 25

Exhibit A89

Date 12/1/1993 12/14/1993 1/13/1994 1/27/1994 1/31/1994 3/1/1994 2/2/1994 1/27/1994 2/2/1994 2/4/1994 3/9/1994 3/10/1994 3/8/1994 4/14/1994 4/19/1994 &/20/94 7/27/1995 2/7/1994 1/19/1994 2/2/1994 2/7/1994

Document Type CR Trans Ltr Proposal COP 89 Minutes COP 90 Proposal COP 90 Ltr Letter Ltr Ltr Memo Memo LTtr Ltr COP 91 CR Proposal COP 91 COP 91 Notes Letter Memo COP 92R1 CR Memo Proposal CR Ltr Proposal COP 92 COP 92 Memo Letter Dly Diary Ltr COP 92R1 Proposal Memo Letter Letter Change Order Notes Fragnet COP 93 CR Trans COP 93 Dly Diary Dly Diary Ltr Dly Diary Memo Notes Memo Ltr Fragnet COP 94 Proposal Dly Diary COP 94 Notes Letter Memo Memo Fragnet smoke detectors BCI - CR responses A&A - no cost A&A remove power poles remove power poles Progress Meeting-

Description

A90

Wiring for 2 Heat Detectors A&A Wiring for 2 Heat Detectors TSG - enclsoe COP 90 DOL - Provide Wiring for Four Smoke Detectors at HV9-1 & HV9-2 of Building M BCI - review COPs DOL - review COPs DOL - review COPs DOL - review COPs DOL - review COPs DOL - review COPs Increased space for telephone landing at main telephone room room on backboard AEC Increased space for telephone landing at main telephone room Draft telephone backbaord DOL - Increase Space for Telephone Landing at Main Telephone Room of Building H DOL - Provide increased space for telephone landing drain and scupper roof drain roof drain size A&A scupper scupper BCI - need cost Ciari - roof drain roof drain and scupper Draft DMJM DOL -NTP TSG - enclose COP 92 roof drain and scupper Ciari - roof drain DOL - Provide roof drain and scupper at Bldg L2 DOL - review COPs DOL - review COPs A&A scupper Ciari - waiting COP 92R1 Add'l Tube Steel bracing short walls R&C - details for partitions Add'l Tube Steel

A91

3/9/1994 4/19/1994 A92 5/4/1994 12/22/1993 12/22/1993 1/13/1994 1/24/1994 1/24/1994 1/25/1994 2/8/1994 2/22/1994 2/25/1994 2/25-2/28/94 3/24/1994 5/4/1994 4/25/1994 6/6/1994 7/20/1994 7/26/1994 8/12/1994 2/14-2/18/94

A93

2/14/1994 12/21/1993 1/19/1994 2/14/1994 2/15-2/18/94 2/22/1994 2/22/1994 2/23-3/7/94 4/19/1994 2/22/1994 2/25/1994

TSG - enclose COP 93 DOL - Tube Steel bracing at stair well Steel tube bracing DMJM DOL - NTP COP 93 Misc. Asbestos Abatement Asbestos Misc. Asbestos Abatement Asbestos abatement TSG - enclose COP 94 DOL - review COPS DOL - review COPS COP 94

A94

2/14/1994 2/7/1994 2/11/1994 2/14/1994 2/22/1994 4/19/1994 4/14/1994

A95

7/5/1994 12/21/1993 1/19/1994 2/15-2/16/94 2/15/1994 2/17/1994 2/17-2/18/94 2/22/1994 2/22-2/24/94 2/25/1994 2/25-3/7/94 3/8-3/9/1994 3/28/1994 4/14/1994 4/21/1994 6/30/1994 7/5/1994 7/14/1994 7/20/1994 8/25/1994 8/18/1994 8/25/1994 9/8/1994 10/3/1994

Additional plumbing work COP 95R brace short walls CR R&C - details for L-2 partitions Trans Dly Diary Ciari - extra plumbing Proposal Additional plumbing work COP 95R Dly Diary DMJM - COP 95 Memo Dly Diary DOL - NTP Letter Dly Diary DMJM - COP 95 Dly Report TSG - enclose COP 95 Ltr DOL - review COPs Memo BCI - credit for shower rods Trans JH - credit for shower rods Provide additional plumbing work COP 95R TSG - returning COP 95R Ltr DOL - review COPs Ltr DOL - review COPs Memo DOL - review COPs Memo DOL - review COPs Ltr BCI - diagree 95 covers same work as 104 Ltr TSG - enclose COP 95R1 TLtr COP 95R1 Fragnet

Page 14

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 15 of 25

Exhibit A96

Date 7/6/1994 11/12/1993 12/6/1993 12/6/1993 1/25/1994 2/15/1994

Document Type COP 96R CR CR RFI Proposal COP 96 COP 96 Notes Dly Diary Transmittal Dly Diary Letter Dly Diary Dl Report Notes Dly Diary/Rprt Memo Transmittal Memo Letter COP 96R Ltr Letter Ltr Fragnet COP 97 CR Proposal Proposal

Description

Plumbing walls furred ceiling Ciari - waste pipe Ciari - waste pipe Changes to Bathrooms 125 & 130 in Bldg L2 Draft Extend chase space DMJM - need NTP DOL NTP

2/15-2/22/94 2/22/1994 2/23-2/25/94 2/25/1994 2/28/1994 2/28/1994 2/28/1994 3/1-3/8/94 4/14/1994 4/20/1994 6/6/1994 7/18/1994 7/6/1994 7/15/1994 7/26/1994 7/20/1994

framing DOL - review COPS BCI - confirm quote DOL - review COPS Provide Changes to Bathrooms 125 & 130 at Building L2 Changes to Bathrooms 125 & 130 in Bldg L2 TSG - returning COP 96R DOL - review COPS DOL - review COPS COP 96R Provide and install astragals for doors 112, 116, 125 at Bldg M per CR 221 astragals Midwest DCD Astragals Drs. 112,116,125, Bldg. M Install Astragals for Doors 112, 116 & 125 at Building M Install astragals at doors 112, 116, and 125, Bldg M Provide and install astragals for doors 112, 116, 125 at Bldg M per CR 221 Double doors not specified with astragals Draft DOL - NTP TSG - enclose COP 97 DOL - review COPs Midwest - send change order DOL -review COPs BCI Asbestos Abatement Asbestos Asbestos Asbestos Abatement DMJM - asbestos TSG - enclsoe cOP 98 DOL - review COPs DOL - review COPs COP 98 Tube Steel Frame canopy at Bld H R&C - resposne DMJM - add'l info Hewatt Tube Steel Frame TSG - COP 99 incomplete DOL - review COPs Ceil. Exhaust Duct in Bathrooms, L-1,L-3 furred ceiling G&S Ceil. Exhaust Duct in Bathrooms, L-1,L-3 Ceilings furred down in bathrooms of L1 & L3 DMJM - cost Draft TSG - enclsoe COP 100 G&S DOL - NTP DOL - NTP DOL - NTP DOL - review COPs DOL - review COPs COP 100 Handrails handrails Hewatt handrails Hewatt handrails Hewatt added work Handrails Extending handrails Hewatt -no credit BCI - extra hadrail DOL - review COPs BCI - discuss COPs TSG - re 11/1/94 letter Sheetrock 1 hr. Light Fixtures AEC - recessed fixtures AEC - changed fixtures

A97

2/17/1994 1/27/1994 2/14/1994 2/15/1994 2/17/1994 3/9/1994 4/20/1994 2/17/1994

3/4/1994 3/14/1994 4/14/1994 4/15/1994 4/19/1994 4/21/1994 A98 2/17/1994 2/15/1994 2/16/1994 2/17/1994 2/16/1994 2/23/1994 3/14/1994 4/14/1994 4/19/1994

Letter Memo COP 97 Notes COP 97 Ltr Ltr Memo Ltr Memo Ltr COP 98 Proposal Proposal COP 98 Memo Dly Report Ltr Memo Memo Fragnet COP 99 CR Trans Memo Proposal COP 99 Ltr Ltr COP 100 CR Proposal COP 100 Notes Memo COP 100 Ltr Proposal Ltr Letter Letter Dly Diary/Rprt Memo Dly Diary/Rprt Memo Dly Diary/Rprt Fragnet COP 101 CR RFI Proposal Proposal COP 101 Notes Letter Ltr Letter Ltr Ltr COP 178 Ltr Ltr

A99

2/18/1994 6/24/1993 8/6/1993 9/10/1993 2/11/1994 2/18/1994 2/22/1994 7/20/1994 2/18/1994 2/11/1994 2/17/1994 2/18/1994 3/2/1994 2/22/1994 3/8/1994 3/8/1994 3/9/1994 3/9/1994 3/14-4/14/94 4/14/1994 4/15-4/19/94 4/19/1994 4/20-7/29/94

A100

A101

2/18/1994 12/29/1993 12/29/1993 2/15/1994 2/18/1994 2/22/1994 4/11/1994 7/20/1994 11/11/1994 11/17/1994

A102

2/18/1994 11/12/1993 11/12/1993

Page 15

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 16 of 25

Exhibit

Document Type CR Dly Diary Dly Diary Dly Diary Ltr Notes 2/24-3/8/1994 Dly Diary/Rprt 3/8/1994 Proposal 3/9-4/8/94 Dly Diary/Rprt 4/20/1994 Memo 4/22/1994 Memo 4/27/1994 COP 102R1 5/12/1994 Ltr 5/23/1994 Memo 6/6/1994 Memo 6/10/1994 Notes 6/15/1994 COP 178 COP 178 6/21/1994 Ltr 6/26/1994 Ltr 8/12/1994 Change Order 10/3/1994 Ltr Date 11/24/1993 2/3/1994 2/9-2/10/1994 2/24/1994 2/22/1994 5/3/1994 8/23/1993 11/2/1993 1/24/1994 2/10/1994 2/18/1994 4/12/1994 2/22/1994 4/25/1994 4/25/?? 4/14/1994 4/19/1994 5/3/1994 5/12/1994 COP 101R1 Ltr Proposal Ltr Ltr COP 103 Notes Proposal Ltr Memo Notes Lmemo Memo COP 103R1 Ltr COP 104 CR RFI Proposal COP 104 Ltr Memo Memo Fragnet COP 105 CR Trans Dly Diary CR Proposal Proposal Proposal COP 105 Notes Letter Transmittal Letter Ltr Ltr Fragnet COP 106 CR Proposal Proposal Ltr Letter COP 106 Notes Ltr Ltr Letter Memo Memo Letter Ltr COP 107 Trans COP 107 COP 107 Trans Ltr Notes Memo Memo Fragnet COP 108 Ltr CR Proposal Proposal COP 108 Notes Letter

Description fire rating fixtures

TSG - enclose COP 102 Additional layer of drywall required for 1 hr rating G&S DOL - review COPS was COP 102 revised TSG - enclose COP 102R1 DOL - review COPS DOL - review COPS revise COP 102 Draft TSG - enclose COP 178 DOL - review COPS G&S DOL - review COPS Gutter TSG - gutter and downspout Mancini BCI - help id propsal Mancini Gutter Labor & materials for a metal gutter & downspout Mancini - gutter TSG - enclose COP 103 revise COP 103 DOL - review COPs DOL - review COPs TSG - enclose COP 103R1 Reroute Plumbing Line Bldg. L-2 duct work Ciari - duct work Ciari - duct work Reroute Plumbing Line Bldg. L-2 TSG enclose COP 104 Reroute plumbing line in Bldg L2 DOL - review COPs COP 104 Add'l Steel Canopy, Bldg. L-1,L-3 entrance column R&C - detail for awning floor elevations Hewatt Hewatt Hewatt Add'l Steel Canopy, Bldg. L-1,L-3 Welding at awning support post TSG - enclose COP 105 DMJM - Welding at awning support post DOL - NTP DOL - NTP DOL - review COPs COP 105 Provide power for 4-30 AMP circuits for heater cables heat cable AEC AEC DOL - NTP DOL - review COPs Heat regulating cable DOL - NTP BCI - review COPs TSG - enclsoe COP 106 DOL - review COPs DOL - review COPs DOL - review COPs DOL - review COPs Add'l Nailing Bldg. L-1 TSG - add'l nailing detail Add'l Nailing Bldg. L-1 Draft R&C - revised nailing detail TSG - enclose COP 107 Additional nailing DOL - review COPs DOL - review COPs COP 107 Wiring & GFI Cir Brkrs L-1,L-3 DOL - review COPs heat cable AEC AEC Wiring & GFI Cir Brkrs L-1,L-3 Heat regulating cable TSG - enclose COP 108

A103

A104

2/18/1994 2/1/1994 2/1/1994 2/16/1994 2/18/1994 2/22/1994 5/9/1994 4/25/1994

A105

2/18/1994 11/16/1993 11/16/1993 12/3-12/16/94 3/4/1994 2/11/1994 2/15/1994 2/18/1994 2/22/1994 3/3/1994 3/8/1994 3/9/1994 7/20/1994

A106

3/1/1994 2/11/1994 2/17/1994 2/28/1994 3/8/1994 3/10/1994 3/1/1994 3/9/1994 3/10/1994 3/14/1994 4/14/1994 4/19/1994 6/27/1994 7/20/1994

A107

3/1/1994 2/6/1994 3/1/1994 3/14/1994 3/14/1994 4/14/1994 4/19/1994

A108

3/3/1994 3/10/1995 2/11/1994 2/17/1994 2/28/1994 3/3/1994 3/14/1994

Page 16

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 17 of 25

Exhibit

Date 3/22/1994 6/27/1994 4/14/1994 4/19/1994

Document Type Letter Ltr Ltr Memo Fragnet Proposal Proposal Memo Letter Letter Memo Notes Memo

Description DOL - NTP DOL - review COPs DOL - review COPs DOL - review COPs COP 108 Provide furring of wall at Bldg F west end of building Provide furring of wall at Bldg F west end Furr Wall Bldg. F Provide furring at west end of Bldg F Provide Furring at West End of Building F Response to 7-6-94 letter from CW to BB, regarding outstanding COPs. Review of records related to those items are addressed. Furring Addl costs for scraping off stucco, applying furring & reapplying stucco Response to BCI 26 July 1994 letter Int. Patching of Existing Plaster Patching plaster at new west wall of Culinary Arts Kitchen, Building F Provide patching of existing plaster at Bldg F Provide Patching of Existing Plaster at Building F Response to 7-6-94 letter from CW to BB, regarding outstanding COPs. Review of records related to those items are addressed. Additional gypsum board and plaster. Reroof Portion of Bldg. H Replace existing built-up roofing Memo regarding meeting. BCI needs NTPs for COPs 114, 113, 111 & 115 Replace Built-Up Roofing at Building H Reroof existing portion of Bldg H Existing roof on Bldg H replacement Credit - Delete Stop/ Holders Credit for deletion of stop/holders at Hardware Group 33 Delete 7 door stops outside Bldg N Door stops bldg N Memo regarding meeting and COPs 114, 113, 111 & 115 Roof Drain, Overflow, Bldg. H Replace Roof Drainage System for Building H Installation of 5 new roof and overflow drains with associated piping at existing portions of Bldg H Five new roof and overflow drains and associated piping New roof drains & overflow scuppers Memo regarding meeting and BCI needs NTPs for COPs 114, 113, 111, & 115 2" Roof Drain in Sump Roof Bldg. H Add One Additional Roof & Overflow Drain to Building H Installation of new roof and overflow drain with associated piping at NE corner of existing Bldg H where existing construction interfaces with new construction Provide 2" roof drain at Bldg H roof Response to 7-6-94 letter from CW to BB, regarding outstanding COPs. Review of records related to those items are addressed. Additional roof drain with associated piping & overflow scupper Memo regarding meeting, BCI needs NTPs for COPs 114, 113, 111 & 115 Furr Cling. Additional Furring at Toilet Ceilings at Building L2 & Additional Furring for Plumbing at Buildings L1 & L3 Ceiling Furring Furr down ceiling to clear pipes per sketches Furr down ceiling to clear pipes Install Light Fixtures Revised Electrical for One-hour light fixtures Addl electrical work at 1 hour light fixture Additional labor due to one hour enclosure change Additional labor and material for electrical work Misc. Demo/Sawcutting Revised

A109

3/4/1994 3/4/1994 3/4/1994 6/6/1994 7/18/1994 7/25/1994 9/9/1994

A110

3/4/1994 4/13/1994 6/30/1994 7/18/1994 7/25/1994

Letter Memo Letter Letter Notes

A111

3/1/1994 3/2/1994 3/8/1994 3/9/1994 4/20/1994

Memo Transmittal Letter Memo Notes

A112

3/8/1994 3/14/1994 4/20/1994

Letter Memo Notes

A113

3/8/1994 3/8/1994 3/9/1994 3/14/1994 4/20/1994

Transmittal Letter Letter Memo Notes Transmittal Letter Letter Memo Letter Notes Transmittal

A114

3/8/1994 3/8/1994 3/9/1994 3/14/1994 4/20/1994 7/25/1994

A115

3/8/1994 3/8/1994 3/9/1994 3/21/1994 4/20/1994

Letter Memo Memo Notes

A116

3/10/1994 3/21/1994 3/22/1994 4/20/1994

Memo Letter Memo Notes

A117

5/3/1994 5/18/1994 6/30/1994 7/18/1994 7/25/1994

Transmittal Memo Letter Letter Notes Proposal Proposal Letter Letter Memo Notes

Additional saw cutting due to differing site condition Provide Additional Saw Cutting Due to Differing Site Conditions Response to 7-6-94 letter from CW to BB, regarding outstanding COPs. Review of records related to those items are addressed. Labor for sawcutting concrete, chipping it out & removing from site Provide resloping of floors in Bldg F in serving, pitwash, and entrance to Food storage. Provide resloping of floors in Bldg F in the serving, pitwash and entrance to Food Storage Reslope Floors Bldg. F Provide floor leveling at food service area of Bldg F Response to 7-6-94 letter from CW to BB, regarding outstanding COPs. Review of records related to those items are addressed. Resloping of floors in Bldg F Bring existing slab to level condition Delete inverters for Bldgs F, M & N. Emergency batter pack units will be provided in-lieuthereof as resolved between Ackerman & Allied Delete Inverters Bldg. F, M & N Delete Inverters for Bldgs, F, M and N Request to use standard battery pack units instead of spec'd inverters. Provide removal of existing A.C. paving at Bldgs E & G Revised COP to provide removal of existing AC paving at Bldgs E & G Remove Exist Pave Bldg. E & G Replacement of asphalt paving (including base) Contractor's proposal verification Removal/replacement of asphalt paving between Bldgs E & G Removal/Replacement of Asphalt Paving Between Buildings E & G Response to 7-6-94 letter from CW to BB, regarding outstanding COPs. Review of records related to those items are addressed.

A118

3/16/1994 3/16/1994 3/16/1994 5/19/1994 7/25/1994 8/18/1994

A119

3/22/1994 3/22/1994 4/20/1994

Proposal Memo Notes Proposal Proposal Memo Memo Memo Letter Letter

A120

3/22/1994 4/12/1994 4/12/1994 6/8/1994 6/8/1994 6/30/1994 7/18/1994 7/25/1994

Page 17

Case 1:00-cv-00775-TCW

Document 55-2

Filed 04/21/2006

Page 18 of 25

Exhibit

Date

Document Type Notes

Description Replace asphalt paving between E&G 40 Day Time Extension Extended Job Costs BCI letter 22 March-Delay Damages; CMI Schedule Extension Time extension for COP 45 - CMI Extended Job Costs for CMI/TCU modification COP 45 Response to 7-6-94 letter from CW to BB, regarding outstanding COPs. Review of records related to those items are addressed. Time extension Furr Bldg. L-2 Rms 124 & 132

A121

3/22/1994 3/22/1994 3/23/1994 3/2